Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2015 |
Principal Product | Rolled Aluminum coiling |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3355 - Aluminum Rolling And Drawing, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 54 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 2,000,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $165,559 | 5,017,410 | kWh | $0.03 |
Electricity Demand | $209,081 | 14,250 | kW-months/year | $14.67 |
Natural Gas | $157,005 | 32,623 | MMBtu | $4.81 |
TOTAL ENERGY COSTS | $531,645 | |||
RECOMMENDED SAVINGS* | $63,115 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,417 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $22,508 Cost: $53,520 |
$(-56) | (-1,698) | - | - | $22,564 | 4,691 | - | - |
$(-56) (-1,698) kWh |
- - kW-months/year |
$22,564 4,691 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,645 Cost: $15,271 |
$7,968 | 241,452 | $5,677 | 387 | - | - | - | - |
$7,968 241,452 kWh |
$5,677 387 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $9,770 Cost: $5,240 |
- | - | $9,770 | 666 | - | - | - | - |
- - kWh |
$9,770 666 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,984 Cost: $500 |
- | - | - | - | $5,416 | 1,126 | $(-432) | - |
- - kWh |
- - kW-months/year |
$5,416 1,126 MMBtu |
$(-432) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,624 Cost: $12 |
$2,113 | 64,026 | $1,511 | 103 | - | - | - | - |
$2,113 64,026 kWh |
$1,511 103 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,334 Cost: $486 |
$1,794 | 54,353 | $1,540 | 105 | - | - | - | - |
$1,794 54,353 kWh |
$1,540 105 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $1,890 Cost: $1,060 |
- | - | - | - | $1,890 | 393 | - | - |
- - kWh |
- - kW-months/year |
$1,890 393 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,537 Cost: $556 |
$1,062 | 32,194 | $763 | 52 | - | - | $(-288) | - |
$1,062 32,194 kWh |
$763 52 kW-months/year |
- - MMBtu |
$(-288) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $1,530 Cost: $1,000 |
$1,700 | 51,511 | $1,218 | 83 | - | - | $(-1,388) | - |
$1,700 51,511 kWh |
$1,218 83 kW-months/year |
- - MMBtu |
$(-1,388) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $293 Cost: $69 |
$171 | 5,195 | $122 | 8 | - | - | - | - |
$171 5,195 kWh |
$122 8 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $63,115 Cost: $77,714 |
$14,752 | 447,033 | $20,601 | 1,404 | $29,870 | 6,210 | $(-2,108) | - | $14,752 447,033 kWh |
$20,601 1,404 kW-months/year |
$29,870 6,210 MMBtu |
$(-2,108) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,417 Cost: $16,894 |
$13,108 | 397,220 | $9,613 | 655 | $5,416 | 1,126 | $(-720) | - | $13,108 397,220 kWh |
$9,613 655 kW-months/year |
$5,416 1,126 MMBtu |
$(-720) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |