Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2016 |
Principal Product | Adhesive Manufacturing |
NAICS | 325520 - Adhesive Manufacturing |
SIC | 2891 - Adhesives And Sealants |
Sales | $100,000,000-$500,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 8,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $404,771 | 5,034,960 | kWh | $0.08 |
Electricity Demand | $65,774 | 10,130 | kW-months/year | $6.49 |
Natural Gas | $121,763 | 28,925 | MMBtu | $4.21 |
TOTAL ENERGY COSTS | $592,308 | |||
RECOMMENDED SAVINGS* | $51,161 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,774 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $26,401 Cost: $25,760 |
- | - | $26,401 | 4,068 | - | - | - | - |
- - kWh |
$26,401 4,068 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $10,186 Cost: $8,000 |
$10,186 | 126,686 | - | - | - | - | - | - |
$10,186 126,686 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,543 Cost: $2,714 |
$4,719 | 58,688 | $824 | 127 | - | - | - | - |
$4,719 58,688 kWh |
$824 127 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,142 Cost: $152 |
$2,830 | 35,201 | $312 | 48 | - | - | - | - |
$2,830 35,201 kWh |
$312 48 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,423 Cost: $1,224 |
$2,593 | 32,251 | $286 | 44 | - | - | $(-456) | - |
$2,593 32,251 kWh |
$286 44 kW-months/year |
- - MMBtu |
$(-456) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,612 Cost: $3,592 |
- | - | - | - | $1,612 | 383 | - | - |
- - kWh |
- - kW-months/year |
$1,612 383 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $728 Cost: $443 |
$657 | 8,169 | $71 | 11 | - | - | - | - |
$657 8,169 kWh |
$71 11 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $718 Cost: $500 |
- | - | - | - | $775 | 184 | $(-57) | - |
- - kWh |
- - kW-months/year |
$775 184 MMBtu |
$(-57) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $408 Cost: $728 |
- | - | - | - | $408 | 97 | - | - |
- - kWh |
- - kW-months/year |
$408 97 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $51,161 Cost: $43,113 |
$20,985 | 260,995 | $27,894 | 4,298 | $2,795 | 664 | $(-513) | - | $20,985 260,995 kWh |
$27,894 4,298 kW-months/year |
$2,795 664 MMBtu |
$(-513) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,774 Cost: $9,095 |
$13,673 | 170,056 | $383 | 59 | $775 | 184 | $(-57) | - | $13,673 170,056 kWh |
$383 59 kW-months/year |
$775 184 MMBtu |
$(-57) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |