Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2016 |
Principal Product | Plastic Pipe |
NAICS | 326122 - Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084 - Plastics Pipe |
Sales | $1,000,000-$5,000,000 |
# of Employees | 6 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 4,000,000 Pounds |
Production Hrs. Annual | 2,600 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $64,954 | 873,120 | kWh | $0.07 |
Electricity Demand | $35,869 | 4,484 | kW-months/year | $8.00 |
Electricity Fees | $300 | - | $ | - |
Natural Gas | $3,080 | 353 | MMBtu | $8.73 |
TOTAL ENERGY COSTS | $104,203 | |||
RECOMMENDED SAVINGS* | $9,361 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,459 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,852 Cost: $1,833 |
$2,572 | 34,754 | $1,280 | 160 | - | - | - | - |
$2,572 34,754 kWh |
$1,280 160 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,370 Cost: $980 |
$914 | 12,279 | $456 | 57 | - | - | - | - |
$914 12,279 kWh |
$456 57 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $1,056 Cost: $1,000 |
- | - | $1,056 | 132 | - | - | - | - |
- - kWh |
$1,056 132 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $993 Cost: $125 |
$665 | 8,934 | $328 | 41 | - | - | - | - |
$665 8,934 kWh |
$328 41 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $651 Cost: $1,922 |
$435 | 5,843 | $216 | 27 | - | - | - | - |
$435 5,843 kWh |
$216 27 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $624 Cost: $1,090 |
$416 | 5,593 | $208 | 26 | - | - | - | - |
$416 5,593 kWh |
$208 26 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $498 Cost: $585 |
- | - | - | - | $498 | 57 | - | - |
- - kWh |
- - kW-months/year |
$498 57 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $234 Cost: $90 |
$154 | 2,072 | $80 | 10 | - | - | - | - |
$154 2,072 kWh |
$80 10 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $83 Cost: $168 |
$117 | 1,575 | $56 | 7 | - | - | $(-90) | - |
$117 1,575 kWh |
$56 7 kW-months/year |
- - MMBtu |
$(-90) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $9,361 Cost: $7,793 |
$5,273 | 71,050 | $3,680 | 460 | $498 | 57 | $(-90) | - | $5,273 71,050 kWh |
$3,680 460 kW-months/year |
$498 57 MMBtu |
$(-90) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,459 Cost: $2,890 |
$1,371 | 18,424 | $680 | 85 | $498 | 57 | $(-90) | - | $1,371 18,424 kWh |
$680 85 kW-months/year |
$498 57 MMBtu |
$(-90) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |