IAC logo
IAC Assessment: WV0536
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0536
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2016
Principal Product Sewage treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 320,000
Annual Production 889 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) VA
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,165 1,385,964 kWh $0.05
Electricity Demand $34,537 2,958 kW-months/year $11.68
Electricity Fees $3,514 - $ -
TOTAL ENERGY COSTS $108,216
RECOMMENDED SAVINGS* $29,816 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,720
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,902
Cost:
$82,500
$6,058 119,722 $4,844 414 - - $6,058
119,722
kWh
$4,844
414
kW-months/year
-
-
$
02: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$8,800
Cost:
$31,000
$6,686 132,134 $2,114 181 - - $6,686
132,134
kWh
$2,114
181
kW-months/year
-
-
$
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$3,788
Cost:
$1,000
$3,052 60,314 $2,126 182 $(-1,390) - $3,052
60,314
kWh
$2,126
182
kW-months/year
$(-1,390)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,983
Cost:
$2,015
$1,317 26,034 $666 57 - - $1,317
26,034
kWh
$666
57
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,808
Cost:
$2,250
$1,376 27,195 $432 37 - - $1,376
27,195
kWh
$432
37
kW-months/year
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,406
Cost:
$617
$515 10,178 $1,191 102 $(-300) - $515
10,178
kWh
$1,191
102
kW-months/year
$(-300)
-
$
07: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$735
Cost:
$4,320
$618 12,214 $117 10 - - $618
12,214
kWh
$117
10
kW-months/year
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$394
Cost:
$60
$184 3,637 $210 18 - - $184
3,637
kWh
$210
18
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$29,816
Cost:
$123,762
$19,806 391,428 $11,700 1,001 $(-1,690) - $19,806
391,428
kWh
$11,700
1,001
kW-months/year
$(-1,690)
-
$
TOTAL IMPLEMENTED Savings:
$9,720
Cost:
$10,202
$6,878 135,935 $4,532 388 $(-1,690) - $6,878
135,935
kWh
$4,532
388
kW-months/year
$(-1,690)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes