IAC logo
IAC Assessment: WV0555
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0555
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2018
Principal Product Waste Water Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 8
Plant Area (Sq.Ft.) 280,000
Annual Production 2,555,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,040 1,032,620 kWh $0.10
Electricity Demand $15,183 3,322 kW-months/year $4.57
Electricity Fees $432 - $ -
Fuel Oil #2 $10,240 569 MMBtu $18.00
TOTAL ENERGY COSTS $133,895
RECOMMENDED SAVINGS* $47,084 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,409
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,162
Cost:
$53,700
$14,307 136,782 $855 187 - - - - - - $14,307
136,782
kWh
$855
187
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$10,502
Cost:
$18,000
- - - - $(-2,738) (-547) $10,240 569 $3,000 - -
-
kWh
-
-
kW-months/year
$(-2,738)
(-547)
MMBtu
$10,240
569
MMBtu
$3,000
-
$
03: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$6,339
Cost:
$6,000
$5,983 57,196 $356 78 - - - - - - $5,983
57,196
kWh
$356
78
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$5,001
Cost:
$25,000
- - - - - - $5,001 278 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,001
278
MMBtu
-
-
$
05: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$2,502
Cost:
$7,080
$1,999 19,109 $503 110 - - - - - - $1,999
19,109
kWh
$503
110
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$2,455
Cost:
$1,000
$3,623 34,632 $215 47 - - - - $(-1,383) - $3,623
34,632
kWh
$215
47
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-1,383)
-
$
07: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$2,327
Cost:
$4,400
$2,194 20,971 $133 29 - - - - - - $2,194
20,971
kWh
$133
29
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,289
Cost:
$3,732
$2,120 20,269 $169 37 - - - - - - $2,120
20,269
kWh
$169
37
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$507
Cost:
$638
$666 6,366 $41 9 - - - - $(-200) - $666
6,366
kWh
$41
9
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-200)
-
$
TOTAL RECOMMENDED Savings:
$47,084
Cost:
$119,550
$30,892 295,325 $2,272 497 $(-2,738) (-547) $15,241 847 $1,417 - $30,892
295,325
kWh
$2,272
497
kW-months/year
$(-2,738)
(-547)
MMBtu
$15,241
847
MMBtu
$1,417
-
$
TOTAL IMPLEMENTED Savings:
$35,409
Cost:
$101,432
$20,050 191,683 $1,239 271 $(-2,738) (-547) $15,241 847 $1,617 - $20,050
191,683
kWh
$1,239
271
kW-months/year
$(-2,738)
(-547)
MMBtu
$15,241
847
MMBtu
$1,617
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes