Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2018 |
Principal Product | Electroplating |
NAICS | 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471 - Plating And Polishing |
Sales | $1,000,000-$5,000,000 |
# of Employees | 22 |
Plant Area (Sq.Ft.) | 28,000 |
Annual Production | 5,200 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $41,853 | 589,925 | kWh | $0.07 |
Electricity Demand | $18,292 | 2,488 | kW-months/year | $7.35 |
Electricity Fees | $5,410 | - | $ | - |
Natural Gas | $37,219 | 5,386 | MMBtu | $6.91 |
TOTAL ENERGY COSTS | $102,774 | |||
RECOMMENDED SAVINGS* | $43,056 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,347 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $11,443 Cost: $23,150 |
- | - | - | - | $11,443 | 1,656 | - | - | - | - |
- - kWh |
- - kW-months/year |
$11,443 1,656 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $5,472 Cost: $5,600 |
- | - | $5,472 | 600 | - | - | - | - | - | - |
- - kWh |
$5,472 600 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $9,322 Cost: $15,000 |
$21 | 293 | $18 | 2 | $283 | 41 | - | - | $9,000 | - |
$21 293 kWh |
$18 2 kW-months/year |
$283 41 MMBtu |
- - Tgal |
$9,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $5,896 Cost: $6,014 |
$3,384 | 47,733 | $2,512 | 275 | - | - | - | - | - | - |
$3,384 47,733 kWh |
$2,512 275 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,472 Cost: $2,150 |
$2,566 | 36,192 | $1,906 | 209 | - | - | - | - | - | - |
$2,566 36,192 kWh |
$1,906 209 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5131 RECYCLE WHITE WATER |
Savings: $4,061 Cost: $450 |
- | - | - | - | - | - | $4,061 | 343 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,061 343 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,487 Cost: $1,690 |
- | - | - | - | $1,487 | 163 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,487 163 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $495 Cost: $500 |
- | - | - | - | $518 | 75 | - | - | $(-23) | - |
- - kWh |
- - kW-months/year |
$518 75 MMBtu |
- - Tgal |
$(-23) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $408 Cost: $563 |
$267 | 3,768 | $201 | 22 | - | - | - | - | $(-60) | - |
$267 3,768 kWh |
$201 22 kW-months/year |
- - MMBtu |
- - Tgal |
$(-60) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,056 Cost: $55,117 |
$6,238 | 87,986 | $10,109 | 1,108 | $13,731 | 1,935 | $4,061 | 343 | $8,917 | - | $6,238 87,986 kWh |
$10,109 1,108 kW-months/year |
$13,731 1,935 MMBtu |
$4,061 343 Tgal |
$8,917 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,347 Cost: $9,217 |
$3,651 | 51,501 | $2,713 | 297 | $2,005 | 238 | $4,061 | 343 | $(-83) | - | $3,651 51,501 kWh |
$2,713 297 kW-months/year |
$2,005 238 MMBtu |
$4,061 343 Tgal |
$(-83) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes |