IAC Assessment: WV0567
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0567
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2018
Principal Product Electroplating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 22
Plant Area (Sq.Ft.) 28,000
Annual Production 5,200 Pieces
Production Hrs. Annual 2,080
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,853 589,925 kWh $0.07
Electricity Demand $18,292 2,488 kW-months/year $7.35
Electricity Fees $5,410 - $ -
Natural Gas $37,219 5,386 MMBtu $6.91
TOTAL ENERGY COSTS $102,774
RECOMMENDED SAVINGS* $43,056 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,347
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$11,443
Cost:
$23,150
- - - - $11,443 1,656 - - - - -
-
kWh
-
-
kW-months/year
$11,443
1,656
MMBtu
-
-
Tgal
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,472
Cost:
$5,600
- - $5,472 600 - - - - - - -
-
kWh
$5,472
600
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$9,322
Cost:
$15,000
$21 293 $18 2 $283 41 - - $9,000 - $21
293
kWh
$18
2
kW-months/year
$283
41
MMBtu
-
-
Tgal
$9,000
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,896
Cost:
$6,014
$3,384 47,733 $2,512 275 - - - - - - $3,384
47,733
kWh
$2,512
275
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,472
Cost:
$2,150
$2,566 36,192 $1,906 209 - - - - - - $2,566
36,192
kWh
$1,906
209
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 3.5131 RECYCLE WHITE WATER Savings:
$4,061
Cost:
$450
- - - - - - $4,061 343 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,061
343
Tgal
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,487
Cost:
$1,690
- - - - $1,487 163 - - - - -
-
kWh
-
-
kW-months/year
$1,487
163
MMBtu
-
-
Tgal
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$495
Cost:
$500
- - - - $518 75 - - $(-23) - -
-
kWh
-
-
kW-months/year
$518
75
MMBtu
-
-
Tgal
$(-23)
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$408
Cost:
$563
$267 3,768 $201 22 - - - - $(-60) - $267
3,768
kWh
$201
22
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-60)
-
$
TOTAL RECOMMENDED Savings:
$43,056
Cost:
$55,117
$6,238 87,986 $10,109 1,108 $13,731 1,935 $4,061 343 $8,917 - $6,238
87,986
kWh
$10,109
1,108
kW-months/year
$13,731
1,935
MMBtu
$4,061
343
Tgal
$8,917
-
$
TOTAL IMPLEMENTED Savings:
$12,347
Cost:
$9,217
$3,651 51,501 $2,713 297 $2,005 238 $4,061 343 $(-83) - $3,651
51,501
kWh
$2,713
297
kW-months/year
$2,005
238
MMBtu
$4,061
343
Tgal
$(-83)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes