IAC logo
IAC Assessment: WV0583
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0583
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2019
Principal Product Decal graphics and signs
NAICS 339950 - Sign Manufacturing
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 225,000
Annual Production 1,650,000 Units
Production Hrs. Annual 6,000
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,856 3,461,552 kWh $0.05
Electricity Demand $216,908 14,058 kW-months/year $15.43
Electricity Fees $13,339 - $ -
Other Gas $48,598 2,786 MMBtu $17.44
TOTAL ENERGY COSTS $436,701
RECOMMENDED SAVINGS* $50,887 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,227
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,290
Cost:
$53,184
$15,382 337,316 $10,908 707 $15,382
337,316
kWh
$10,908
707
kW-months/year
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,666
Cost:
$2,560
- - $6,666 432 -
-
kWh
$6,666
432
kW-months/year
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$6,740
Cost:
$4,320
$2,890 63,376 $3,850 232 $2,890
63,376
kWh
$3,850
232
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,446
Cost:
$28
$2,057 45,105 $1,389 90 $2,057
45,105
kWh
$1,389
90
kW-months/year
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,448
Cost:
-
$1,460 32,022 $988 64 $1,460
32,022
kWh
$988
64
kW-months/year
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,254
Cost:
$5,905
$1,344 29,469 $910 59 $1,344
29,469
kWh
$910
59
kW-months/year
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,271
Cost:
$607
$762 16,712 $509 33 $762
16,712
kWh
$509
33
kW-months/year
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,265
Cost:
$582
$756 16,579 $509 33 $756
16,579
kWh
$509
33
kW-months/year
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$507
Cost:
$270
$306 6,714 $201 13 $306
6,714
kWh
$201
13
kW-months/year
TOTAL RECOMMENDED Savings:
$50,887
Cost:
$67,456
$24,957 547,293 $25,930 1,663 $24,957
547,293
kWh
$25,930
1,663
kW-months/year
TOTAL IMPLEMENTED Savings:
$35,227
Cost:
$54,671
$20,723 454,448 $14,504 940 $20,723
454,448
kWh
$14,504
940
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand