IAC logo
IAC Assessment: WV0608
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0608
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product OEM Mining Equipment
NAICS 333131 - Mining Machinery and Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 29
Plant Area (Sq.Ft.) 170,000
Annual Production 4,000 Tons
Production Hrs. Annual 5,200
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,932 1,623,520 kWh $0.09
Electricity Demand $16,317 1,547 kW-months/year $10.55
Electricity Fees $4,532 - $ -
Natural Gas $23,641 2,795 MMBtu $8.46
TOTAL ENERGY COSTS $184,422
RECOMMENDED SAVINGS* $46,493 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,534
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$32,464
Cost:
$14,300
$27,805 322,194 $4,659 442 - - $27,805
322,194
kWh
$4,659
442
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,495
Cost:
$38,306
$7,195 83,465 $2,300 218 - - $7,195
83,465
kWh
$2,300
218
kW-months/year
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,836
Cost:
$1,100
$2,425 28,134 $411 39 - - $2,425
28,134
kWh
$411
39
kW-months/year
-
-
$
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$952
Cost:
-
- - $2,152 204 $(-1,200) - -
-
kWh
$2,152
204
kW-months/year
$(-1,200)
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$746
Cost:
$300
$977 11,333 $169 16 $(-400) - $977
11,333
kWh
$169
16
kW-months/year
$(-400)
-
$
TOTAL RECOMMENDED Savings:
$46,493
Cost:
$54,006
$38,402 445,126 $9,691 919 $(-1,600) - $38,402
445,126
kWh
$9,691
919
kW-months/year
$(-1,600)
-
$
TOTAL IMPLEMENTED Savings:
$4,534
Cost:
$1,400
$3,402 39,467 $2,732 259 $(-1,600) - $3,402
39,467
kWh
$2,732
259
kW-months/year
$(-1,600)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes