IAC logo
IAC Assessment: WV0618
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0618
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2022
Principal Product Metal parts
NAICS 332710 - Machine Shops
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 80
Plant Area (Sq.Ft.) 50,451
Annual Production 26,000 Pieces
Production Hrs. Annual 5,226
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,883 908,534 kWh $0.07
Electricity Demand $32,821 3,111 kW-months/year $10.55
Electricity Fees $2,100 - $ -
Natural Gas $19,493 2,442 MMBtu $7.98
TOTAL ENERGY COSTS $114,297
RECOMMENDED SAVINGS* $31,738 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,264
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,096
Cost:
$10,131
$16,336 237,787 $5,760 546 - - $16,336
237,787
kWh
$5,760
546
kW-months/year
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,969
Cost:
$4,600
- - $4,969 471 - - -
-
kWh
$4,969
471
kW-months/year
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,452
Cost:
$1,125
$1,072 15,600 $380 36 - - $1,072
15,600
kWh
$380
36
kW-months/year
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,409
Cost:
$3,970
$1,029 14,972 $380 36 - - $1,029
14,972
kWh
$380
36
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,089
Cost:
$525
$804 11,696 $285 27 - - $804
11,696
kWh
$285
27
kW-months/year
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$369
Cost:
$1,670
$343 4,999 $116 11 $(-90) - $343
4,999
kWh
$116
11
kW-months/year
$(-90)
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$354
Cost:
$90
$259 3,769 $95 9 - - $259
3,769
kWh
$95
9
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$31,738
Cost:
$22,111
$19,843 288,823 $11,985 1,136 $(-90) - $19,843
288,823
kWh
$11,985
1,136
kW-months/year
$(-90)
-
$
TOTAL IMPLEMENTED Savings:
$3,264
Cost:
$3,410
$2,478 36,064 $876 83 $(-90) - $2,478
36,064
kWh
$876
83
kW-months/year
$(-90)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes