Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2022 |
Principal Product | Construction Equipment |
NAICS | 333120 - Construction Machinery Manufacturing |
SIC | 3531 - Construction Machinery |
Sales | $50,000,000-$100,000,000 |
# of Employees | 480 |
Plant Area (Sq.Ft.) | 800,000 |
Annual Production | 1,500 Units |
Production Hrs. Annual | 2,880 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $266,094 | 6,087,333 | kWh | $0.04 |
Electricity Demand | $208,747 | 22,228 | kW-months/year | $9.39 |
Electricity Fees | $11,938 | - | $ | - |
Natural Gas | $286,598 | 26,180 | MMBtu | $10.95 |
TOTAL ENERGY COSTS | $773,377 | |||
RECOMMENDED SAVINGS* | $277,108 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $196,251 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $72,629 Cost: $104,885 |
$38,224 | 874,693 | $34,405 | 3,664 | - | - | - | - | - | - |
$38,224 874,693 kWh |
$34,405 3,664 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $61,441 Cost: $127,733 |
$1,899 | 43,453 | $554 | 59 | $58,988 | 5,387 | - | - | - | - |
$1,899 43,453 kWh |
$554 59 kW-months/year |
$58,988 5,387 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $51,704 Cost: $257,600 |
$27,281 | 624,270 | $24,423 | 2,601 | - | - | - | - | - | - |
$27,281 624,270 kWh |
$24,423 2,601 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5131 RECYCLE WHITE WATER |
Savings: $19,492 Cost: $11,082 |
$(-172) | (-3,944) | - | - | - | - | $19,664 | 1,285 | - | - |
$(-172) (-3,944) kWh |
- - kW-months/year |
- - MMBtu |
$19,664 1,285 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $19,461 Cost: $91,800 |
$(-8,178) | (-187,129) | $(-7,324) | (-780) | $34,963 | 3,193 | - | - | - | - |
$(-8,178) (-187,129) kWh |
$(-7,324) (-780) kW-months/year |
$34,963 3,193 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $14,348 Cost: $3,600 |
- | - | $14,348 | 1,528 | - | - | - | - | - | - |
- - kWh |
$14,348 1,528 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $12,693 Cost: $51,500 |
$2,570 | 58,800 | $2,301 | 245 | $28,350 | 2,589 | - | - | $(-20,528) | - |
$2,570 58,800 kWh |
$2,301 245 kW-months/year |
$28,350 2,589 MMBtu |
- - Tgal |
$(-20,528) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7314 REDUCE VENTILATION AIR |
Savings: $8,396 Cost: $19,558 |
$90 | 2,058 | $28 | 3 | $8,278 | 756 | - | - | - | - |
$90 2,058 kWh |
$28 3 kW-months/year |
$8,278 756 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR |
Savings: $6,154 Cost: $13,600 |
- | - | - | - | $6,154 | 562 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,154 562 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,877 Cost: $2,813 |
$1,515 | 34,680 | $1,362 | 145 | - | - | - | - | - | - |
$1,515 34,680 kWh |
$1,362 145 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $1,756 Cost: $299 |
$1,756 | 40,188 | - | - | - | - | - | - | - | - |
$1,756 40,188 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,660 Cost: $3,000 |
- | - | - | - | $1,960 | 179 | - | - | $(-300) | - |
- - kWh |
- - kW-months/year |
$1,960 179 MMBtu |
- - Tgal |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,487 Cost: $990 |
$1,040 | 23,800 | $447 | 48 | - | - | - | - | - | - |
$1,040 23,800 kWh |
$447 48 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,356 Cost: $2,300 |
$845 | 19,349 | $751 | 80 | - | - | - | - | $(-240) | - |
$845 19,349 kWh |
$751 80 kW-months/year |
- - MMBtu |
- - Tgal |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $1,341 Cost: $4,835 |
$900 | 20,598 | $441 | 47 | - | - | - | - | - | - |
$900 20,598 kWh |
$441 47 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $313 Cost: $1,500 |
$1,203 | 27,518 | $1,080 | 115 | - | - | - | - | $(-1,970) | - |
$1,203 27,518 kWh |
$1,080 115 kW-months/year |
- - MMBtu |
- - Tgal |
$(-1,970) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $277,108 Cost: $697,095 |
$68,973 | 1,578,334 | $72,816 | 7,755 | $138,693 | 12,666 | $19,664 | 1,285 | $(-23,038) | - | $68,973 1,578,334 kWh |
$72,816 7,755 kW-months/year |
$138,693 12,666 MMBtu |
$19,664 1,285 Tgal |
$(-23,038) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $196,251 Cost: $504,455 |
$73,460 | 1,681,031 | $62,383 | 6,644 | $60,948 | 5,566 | - | - | $(-540) | - | $73,460 1,681,031 kWh |
$62,383 6,644 kW-months/year |
$60,948 5,566 MMBtu |
- - Tgal |
$(-540) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes |