IAC logo
IAC Assessment: WV0623
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0623
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2022
Principal Product Construction Equipment
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 480
Plant Area (Sq.Ft.) 800,000
Annual Production 1,500 Units
Production Hrs. Annual 2,880
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,094 6,087,333 kWh $0.04
Electricity Demand $208,747 22,228 kW-months/year $9.39
Electricity Fees $11,938 - $ -
Natural Gas $286,598 26,180 MMBtu $10.95
TOTAL ENERGY COSTS $773,377
RECOMMENDED SAVINGS* $277,108 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $196,251
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$72,629
Cost:
$104,885
$38,224 874,693 $34,405 3,664 - - - - - - $38,224
874,693
kWh
$34,405
3,664
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$61,441
Cost:
$127,733
$1,899 43,453 $554 59 $58,988 5,387 - - - - $1,899
43,453
kWh
$554
59
kW-months/year
$58,988
5,387
MMBtu
-
-
Tgal
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$51,704
Cost:
$257,600
$27,281 624,270 $24,423 2,601 - - - - - - $27,281
624,270
kWh
$24,423
2,601
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 3.5131 RECYCLE WHITE WATER Savings:
$19,492
Cost:
$11,082
$(-172) (-3,944) - - - - $19,664 1,285 - - $(-172)
(-3,944)
kWh
-
-
kW-months/year
-
-
MMBtu
$19,664
1,285
Tgal
-
-
$
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$19,461
Cost:
$91,800
$(-8,178) (-187,129) $(-7,324) (-780) $34,963 3,193 - - - - $(-8,178)
(-187,129)
kWh
$(-7,324)
(-780)
kW-months/year
$34,963
3,193
MMBtu
-
-
Tgal
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,348
Cost:
$3,600
- - $14,348 1,528 - - - - - - -
-
kWh
$14,348
1,528
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$12,693
Cost:
$51,500
$2,570 58,800 $2,301 245 $28,350 2,589 - - $(-20,528) - $2,570
58,800
kWh
$2,301
245
kW-months/year
$28,350
2,589
MMBtu
-
-
Tgal
$(-20,528)
-
$
08: 2.7314 REDUCE VENTILATION AIR Savings:
$8,396
Cost:
$19,558
$90 2,058 $28 3 $8,278 756 - - - - $90
2,058
kWh
$28
3
kW-months/year
$8,278
756
MMBtu
-
-
Tgal
-
-
$
09: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$6,154
Cost:
$13,600
- - - - $6,154 562 - - - - -
-
kWh
-
-
kW-months/year
$6,154
562
MMBtu
-
-
Tgal
-
-
$
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,877
Cost:
$2,813
$1,515 34,680 $1,362 145 - - - - - - $1,515
34,680
kWh
$1,362
145
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
11: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,756
Cost:
$299
$1,756 40,188 - - - - - - - - $1,756
40,188
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
12: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,660
Cost:
$3,000
- - - - $1,960 179 - - $(-300) - -
-
kWh
-
-
kW-months/year
$1,960
179
MMBtu
-
-
Tgal
$(-300)
-
$
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,487
Cost:
$990
$1,040 23,800 $447 48 - - - - - - $1,040
23,800
kWh
$447
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
14: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,356
Cost:
$2,300
$845 19,349 $751 80 - - - - $(-240) - $845
19,349
kWh
$751
80
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-240)
-
$
15: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,341
Cost:
$4,835
$900 20,598 $441 47 - - - - - - $900
20,598
kWh
$441
47
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
16: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$313
Cost:
$1,500
$1,203 27,518 $1,080 115 - - - - $(-1,970) - $1,203
27,518
kWh
$1,080
115
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,970)
-
$
TOTAL RECOMMENDED Savings:
$277,108
Cost:
$697,095
$68,973 1,578,334 $72,816 7,755 $138,693 12,666 $19,664 1,285 $(-23,038) - $68,973
1,578,334
kWh
$72,816
7,755
kW-months/year
$138,693
12,666
MMBtu
$19,664
1,285
Tgal
$(-23,038)
-
$
TOTAL IMPLEMENTED Savings:
$196,251
Cost:
$504,455
$73,460 1,681,031 $62,383 6,644 $60,948 5,566 - - $(-540) - $73,460
1,681,031
kWh
$62,383
6,644
kW-months/year
$60,948
5,566
MMBtu
-
-
Tgal
$(-540)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes