IAC Assessment: WV0624
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0624
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2022
Principal Product Modular Carpet
NAICS 314110 - Carpet and Rug Mills
SIC 2273 - Carpets And Rugs
Sales $50,000,000-$100,000,000
# of Employees 490
Plant Area (Sq.Ft.) 1,932,820
Annual Production 20,000,000 Units
Production Hrs. Annual 6,240
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $702,788 30,331,475 kWh $0.02
Electricity Demand $1,177,248 57,429 kW-months/year $20.50
Electricity Fees $4,105 - $ -
Natural Gas $694,639 151,668 MMBtu $4.58
TOTAL ENERGY COSTS $2,791,606
RECOMMENDED SAVINGS* $509,285 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $102,551
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$194,747
Cost:
$906,700
$18,920 819,060 $23,001 1,122 - - $212,826 6,921,160 $(-60,000) - $18,920
819,060
kWh
$23,001
1,122
kW-months/year
-
-
MMBtu
$212,826
6,921,160
lb
$(-60,000)
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$59,403
Cost:
$137,330
- - - - $59,403 12,970 - - - - -
-
kWh
-
-
kW-months/year
$59,403
12,970
MMBtu
-
-
lb
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$46,923
Cost:
$170,200
$21,175 916,647 $25,748 1,256 - - - - - - $21,175
916,647
kWh
$25,748
1,256
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$46,261
Cost:
$53,185
$15,306 662,578 $30,955 1,510 - - - - - - $15,306
662,578
kWh
$30,955
1,510
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$39,601
Cost:
$115,224
$15,985 691,987 $23,616 1,152 - - - - - - $15,985
691,987
kWh
$23,616
1,152
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$33,682
Cost:
$7,000
- - $33,682 1,643 - - - - - - -
-
kWh
$33,682
1,643
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$26,225
Cost:
$2,763
$11,834 512,276 $14,391 702 - - - - - - $11,834
512,276
kWh
$14,391
702
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$16,511
Cost:
$450
$7,450 322,498 $9,061 442 - - - - - - $7,450
322,498
kWh
$9,061
442
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,209
Cost:
$15,750
$3,382 146,427 $6,827 333 - - - - - - $3,382
146,427
kWh
$6,827
333
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$6,918
Cost:
$2,242
$3,300 142,836 $4,018 196 - - - - $(-400) - $3,300
142,836
kWh
$4,018
196
kW-months/year
-
-
MMBtu
-
-
lb
$(-400)
-
$
11: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$6,371
Cost:
$1,500
$3,519 152,359 $4,285 209 - - - - $(-1,433) - $3,519
152,359
kWh
$4,285
209
kW-months/year
-
-
MMBtu
-
-
lb
$(-1,433)
-
$
12: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$5,615
Cost:
$6,090
- - - - $5,615 1,266 - - - - -
-
kWh
-
-
kW-months/year
$5,615
1,266
MMBtu
-
-
lb
-
-
$
13: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,157
Cost:
$6,050
- - - - $5,157 1,126 - - - - -
-
kWh
-
-
kW-months/year
$5,157
1,126
MMBtu
-
-
lb
-
-
$
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,241
Cost:
$6,840
$1,781 77,095 $2,460 120 - - - - - - $1,781
77,095
kWh
$2,460
120
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
15: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$3,975
Cost:
$11,340
- - - - $3,975 868 - - - - -
-
kWh
-
-
kW-months/year
$3,975
868
MMBtu
-
-
lb
-
-
$
16: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,078
Cost:
$3,446
- - - - $3,078 672 - - - - -
-
kWh
-
-
kW-months/year
$3,078
672
MMBtu
-
-
lb
-
-
$
17: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$368
Cost:
$725
$163 7,062 $205 10 - - - - - - $163
7,062
kWh
$205
10
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$509,285
Cost:
$1,446,835
$102,815 4,450,825 $178,249 8,695 $77,228 16,902 $212,826 6,921,160 $(-61,833) - $102,815
4,450,825
kWh
$178,249
8,695
kW-months/year
$77,228
16,902
MMBtu
$212,826
6,921,160
lb
$(-61,833)
-
$
TOTAL IMPLEMENTED Savings:
$102,551
Cost:
$31,016
$28,047 1,214,126 $68,102 3,322 $8,235 1,798 - - $(-1,833) - $28,047
1,214,126
kWh
$68,102
3,322
kW-months/year
$8,235
1,798
MMBtu
-
-
lb
$(-1,833)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes