IAC logo
IAC Assessment: WV0631
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0631
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2022
Principal Product Water Treatment
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $1,000,000-$5,000,000
# of Employees 17
Plant Area (Sq.Ft.) 23,000
Annual Production 510,813 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,285 2,546,957 kWh $0.06
Electricity Demand $43,867 4,158 kW-months/year $10.55
Natural Gas $1,431 248 MMBtu $5.77
TOTAL ENERGY COSTS $199,583
RECOMMENDED SAVINGS* $69,216 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,165
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$30,923
Cost:
$89,840
$24,973 412,101 $5,950 564 - - $24,973
412,101
kWh
$5,950
564
kW-months/year
-
-
$
02: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$22,924
Cost:
$32,450
$18,514 305,504 $4,410 418 - - $18,514
305,504
kWh
$4,410
418
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,513
Cost:
$4,998
$9,002 148,543 $2,511 238 - - $9,002
148,543
kWh
$2,511
238
kW-months/year
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,204
Cost:
$1,911
$1,708 28,180 $496 47 - - $1,708
28,180
kWh
$496
47
kW-months/year
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,092
Cost:
$1,292
$939 15,491 $222 21 $(-69) - $939
15,491
kWh
$222
21
kW-months/year
$(-69)
-
$
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$560
Cost:
$1,500
$1,001 16,524 $243 23 $(-684) - $1,001
16,524
kWh
$243
23
kW-months/year
$(-684)
-
$
TOTAL RECOMMENDED Savings:
$69,216
Cost:
$131,991
$56,137 926,343 $13,832 1,311 $(-753) - $56,137
926,343
kWh
$13,832
1,311
kW-months/year
$(-753)
-
$
TOTAL IMPLEMENTED Savings:
$13,165
Cost:
$7,790
$10,942 180,558 $2,976 282 $(-753) - $10,942
180,558
kWh
$2,976
282
kW-months/year
$(-753)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes