Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2022 |
Principal Product | Ceramic Microsphere |
NAICS | 327110 - Pottery, Ceramics, and Plumbing Fixture Manufacturing |
SIC | 3299 - Nonmetallic Mineral Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 6 |
Plant Area (Sq.Ft.) | 15,400 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 2,000 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $51,954 | 479,600 | kWh | $0.11 |
Electricity Demand | $47,247 | 4,478 | kW-months/year | $10.55 |
Electricity Fees | $1,547 | - | $ | - |
Natural Gas | $4,984 | 529 | MMBtu | $9.42 |
TOTAL ENERGY COSTS | $105,732 | |||
RECOMMENDED SAVINGS* | $30,430 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,550 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $9,179 Cost: $6,500 |
- | - | $9,179 | 870 | - | - | - | - | - | - |
- - kWh |
$9,179 870 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT |
Savings: $4,325 Cost: $5,360 |
$2,732 | 25,229 | $1,593 | 151 | - | - | - | - | - | - |
$2,732 25,229 kWh |
$1,593 151 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,990 Cost: $4,945 |
$2,534 | 23,400 | $1,456 | 138 | - | - | - | - | - | - |
$2,534 23,400 kWh |
$1,456 138 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $3,209 Cost: $6,354 |
$2,207 | 20,376 | $1,002 | 95 | - | - | - | - | - | - |
$2,207 20,376 kWh |
$1,002 95 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $3,167 Cost: $1,125 |
$1,519 | 14,026 | $348 | 33 | $1,300 | 138 | - | - | - | - |
$1,519 14,026 kWh |
$348 33 kW-months/year |
$1,300 138 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,309 Cost: $218 |
$1,454 | 13,428 | $855 | 81 | - | - | - | - | - | - |
$1,454 13,428 kWh |
$855 81 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $2,027 Cost: $394 |
- | - | - | - | - | - | $2,027 | 68 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,027 68 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $949 Cost: $525 |
$601 | 5,547 | $348 | 33 | - | - | - | - | - | - |
$601 5,547 kWh |
$348 33 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $672 Cost: $1,500 |
$829 | 7,654 | $485 | 46 | - | - | - | - | $(-642) | - |
$829 7,654 kWh |
$485 46 kW-months/year |
- - MMBtu |
- - Tgal |
$(-642) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $546 Cost: $1,571 |
$389 | 3,595 | $232 | 22 | - | - | - | - | $(-75) | - |
$389 3,595 kWh |
$232 22 kW-months/year |
- - MMBtu |
- - Tgal |
$(-75) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $57 Cost: $88 |
$36 | 329 | $21 | 2 | - | - | - | - | - | - |
$36 329 kWh |
$21 2 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,430 Cost: $28,580 |
$12,301 | 113,584 | $15,519 | 1,471 | $1,300 | 138 | $2,027 | 68 | $(-717) | - | $12,301 113,584 kWh |
$15,519 1,471 kW-months/year |
$1,300 138 MMBtu |
$2,027 68 Tgal |
$(-717) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,550 Cost: $9,241 |
$5,843 | 53,953 | $3,397 | 322 | - | - | $2,027 | 68 | $(-717) | - | $5,843 53,953 kWh |
$3,397 322 kW-months/year |
- - MMBtu |
$2,027 68 Tgal |
$(-717) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes |