IAC logo
IAC Assessment: WV0648
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0648
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2023
Principal Product Green Hardwood Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 28
Plant Area (Sq.Ft.) 15,957
Annual Production 15,957 Units
Production Hrs. Annual 2,250
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,514 879,496 kWh $0.06
Electricity Demand $63,522 4,307 kW-months/year $14.75
Electricity Fees $10,594 - $ -
TOTAL ENERGY COSTS $123,630
RECOMMENDED SAVINGS* $33,272 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,744
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$15,045
Cost:
$75,000
- - $15,045 1,020 - - - - -
-
kWh
$15,045
1,020
kW-months/year
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,278
Cost:
$7,699
- - - - $5,278 - - - -
-
kWh
-
-
kW-months/year
$5,278
-
$
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,796
Cost:
$1,931
$1,218 21,634 $1,578 107 - - - - $1,218
21,634
kWh
$1,578
107
kW-months/year
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,218
Cost:
$3,090
$920 16,335 $1,298 88 - - - - $920
16,335
kWh
$1,298
88
kW-months/year
-
-
$
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,542
Cost:
$7,652
$642 11,406 $900 61 - - - - $642
11,406
kWh
$900
61
kW-months/year
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,494
Cost:
$566
$624 11,075 $870 59 - - - - $624
11,075
kWh
$870
59
kW-months/year
-
-
$
-
-
$
07: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$1,285
Cost:
$1,500
$821 14,582 $1,151 78 - - $(-687) - $821
14,582
kWh
$1,151
78
kW-months/year
-
-
$
$(-687)
-
$
08: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$1,085
Cost:
$1,500
$739 13,124 $1,033 70 - - $(-687) - $739
13,124
kWh
$1,033
70
kW-months/year
-
-
$
$(-687)
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$997
Cost:
$3,526
$416 7,383 $581 39 - - - - $416
7,383
kWh
$581
39
kW-months/year
-
-
$
-
-
$
10: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$798
Cost:
$127
$798 14,171 - - - - - - $798
14,171
kWh
-
-
kW-months/year
-
-
$
-
-
$
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$611
Cost:
$1,094
$277 4,921 $384 26 - - $(-50) - $277
4,921
kWh
$384
26
kW-months/year
-
-
$
$(-50)
-
$
12: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$123
Cost:
$219
$49 878 $74 5 - - - - $49
878
kWh
$74
5
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$33,272
Cost:
$103,904
$6,504 115,509 $22,914 1,553 $5,278 - $(-1,424) - $6,504
115,509
kWh
$22,914
1,553
kW-months/year
$5,278
-
$
$(-1,424)
-
$
TOTAL IMPLEMENTED Savings:
$8,744
Cost:
$18,053
$4,211 74,783 $5,907 400 - - $(-1,374) - $4,211
74,783
kWh
$5,907
400
kW-months/year
-
-
$
$(-1,374)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes