IAC logo
IAC Assessment: WV0661
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0661
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2024
Principal Product Electroplating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 22
Plant Area (Sq.Ft.) 28,000
Annual Production 5,200 Pieces
Production Hrs. Annual 2,080
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,194 466,871 kWh $0.10
Electricity Demand $21,279 1,953 kW-months/year $10.90
Electricity Fees $8,580 - $ -
Natural Gas $23,097 3,845 MMBtu $6.01
TOTAL ENERGY COSTS $101,150
RECOMMENDED SAVINGS* $23,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,612
Cost:
$15,969
$4,127 39,988 $2,485 228 - - $4,127
39,988
kWh
$2,485
228
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,983
Cost:
$9,744
$3,348 32,443 $1,635 150 - - $3,348
32,443
kWh
$1,635
150
kW-months/year
-
-
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,731
Cost:
$9,700
- - $4,731 434 - - -
-
kWh
$4,731
434
kW-months/year
-
-
MMBtu
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,626
Cost:
$12,165
- - - - $2,626 437 -
-
kWh
-
-
kW-months/year
$2,626
437
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,184
Cost:
$473
$737 7,138 $447 41 - - $737
7,138
kWh
$447
41
kW-months/year
-
-
MMBtu
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,021
Cost:
$3,645
$912 8,836 $109 10 - - $912
8,836
kWh
$109
10
kW-months/year
-
-
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$618
Cost:
$2,517
$476 4,608 $142 13 - - $476
4,608
kWh
$142
13
kW-months/year
-
-
MMBtu
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$523
Cost:
$314
$327 3,166 $196 18 - - $327
3,166
kWh
$196
18
kW-months/year
-
-
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$367
Cost:
$355
- - - - $367 61 -
-
kWh
-
-
kW-months/year
$367
61
MMBtu
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$233
Cost:
$140
$178 1,721 $55 5 - - $178
1,721
kWh
$55
5
kW-months/year
-
-
MMBtu
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$218
Cost:
$713
- - - - $218 36 -
-
kWh
-
-
kW-months/year
$218
36
MMBtu
TOTAL RECOMMENDED Savings:
$23,116
Cost:
$55,735
$10,105 97,900 $9,800 899 $3,211 534 $10,105
97,900
kWh
$9,800
899
kW-months/year
$3,211
534
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas