Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2024 |
Principal Product | Polymers and LED Phosphor |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2819 - Industrial Inorganic Chemicals, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 260,000 |
Annual Production | 4,400 Pounds |
Production Hrs. Annual | 2,125 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $351,720 | 4,901,528 | kWh | $0.07 |
Electricity Demand | $82,362 | 9,728 | kW-months/year | $8.47 |
Electricity Fees | $5,391 | - | $ | - |
Natural Gas | $251,112 | 35,890 | MMBtu | $7.00 |
TOTAL ENERGY COSTS | $690,585 | |||
RECOMMENDED SAVINGS* | $97,592 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $19,270 Cost: $9,950 |
- | - | - | - | - | - | $20,020 | 2,860 | $(-750) | - |
- - kWh |
- - kW-months/year |
- - $ |
$20,020 2,860 MMBtu |
$(-750) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $17,884 Cost: $35,717 |
$14,123 | 196,694 | $3,761 | 444 | - | - | - | - | - | - |
$14,123 196,694 kWh |
$3,761 444 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $13,442 Cost: $5,225 |
$10,876 | 151,475 | $2,566 | 303 | - | - | - | - | - | - |
$10,876 151,475 kWh |
$2,566 303 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $11,909 Cost: $6,900 |
- | - | $11,909 | 1,406 | - | - | - | - | - | - |
- - kWh |
$11,909 1,406 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $6,542 Cost: $14,640 |
$3,925 | 54,669 | $2,617 | 309 | - | - | - | - | - | - |
$3,925 54,669 kWh |
$2,617 309 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $6,200 Cost: $11,000 |
$827 | 11,518 | $551 | 65 | - | - | $7,245 | 1,035 | $(-2,423) | - |
$827 11,518 kWh |
$551 65 kW-months/year |
- - $ |
$7,245 1,035 MMBtu |
$(-2,423) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,194 Cost: $16,795 |
$3,388 | 37,768 | $1,806 | 213 | - | - | - | - | - | - |
$3,388 37,768 kWh |
$1,806 213 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,886 Cost: $1,088 |
$3,953 | 55,055 | $933 | 110 | - | - | - | - | - | - |
$3,953 55,055 kWh |
$933 110 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $3,954 Cost: $10,900 |
$3,200 | 44,569 | $754 | 89 | - | - | - | - | - | - |
$3,200 44,569 kWh |
$754 89 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $2,422 Cost: $7,600 |
- | - | - | - | - | - | $2,422 | 346 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,422 346 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,467 Cost: $940 |
- | - | - | - | - | - | $1,467 | 210 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$1,467 210 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,463 Cost: $1,143 |
$921 | 12,833 | $610 | 72 | - | - | - | - | $(-68) | - |
$921 12,833 kWh |
$610 72 kW-months/year |
- - $ |
- - MMBtu |
$(-68) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,227 Cost: $5,535 |
- | - | - | - | $1,227 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,227 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $843 Cost: $1,200 |
$976 | 13,594 | $652 | 77 | - | - | - | - | $(-785) | - |
$976 13,594 kWh |
$652 77 kW-months/year |
- - $ |
- - MMBtu |
$(-785) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES |
Savings: $397 Cost: $1,920 |
$321 | 4,476 | $76 | 9 | - | - | - | - | - | - |
$321 4,476 kWh |
$76 9 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $357 Cost: $798 |
- | - | - | - | - | - | $357 | 51 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$357 51 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $135 Cost: $363 |
$109 | 1,517 | $26 | 3 | - | - | - | - | - | - |
$109 1,517 kWh |
$26 3 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $97,592 Cost: $131,714 |
$42,619 | 584,168 | $26,261 | 3,100 | $1,227 | - | $31,511 | 4,502 | $(-4,026) | - | $42,619 584,168 kWh |
$26,261 3,100 kW-months/year |
$1,227 - $ |
$31,511 4,502 MMBtu |
$(-4,026) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes |