IAC logo
IAC Assessment: WV0685
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0685
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2025
Principal Product Metal
NAICS 332313 - Plate Work Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 80,000
Annual Production 10,000 Units
Production Hrs. Annual 5,775
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,973 755,318 kWh $0.06
Electricity Demand $58,186 3,497 kW-months/year $16.64
Electricity Fees $3,011 - $ -
Natural Gas $19,255 1,735 MMBtu $11.10
TOTAL ENERGY COSTS $122,425
RECOMMENDED SAVINGS* $29,694 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,445
Cost:
$16,580
$6,173 103,567 $8,272 487 $6,173
103,567
kWh
$8,272
487
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,381
Cost:
$3,621
$4,502 75,530 $2,879 173 $4,502
75,530
kWh
$2,879
173
kW-months/year
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,411
Cost:
$9,050
- - $3,411 205 -
-
kWh
$3,411
205
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,123
Cost:
$513
$1,341 22,499 $782 47 $1,341
22,499
kWh
$782
47
kW-months/year
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,728
Cost:
$8,100
$796 13,356 $932 56 $796
13,356
kWh
$932
56
kW-months/year
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$366
Cost:
$435
$233 3,905 $133 8 $233
3,905
kWh
$133
8
kW-months/year
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$240
Cost:
$210
$157 2,633 $83 5 $157
2,633
kWh
$83
5
kW-months/year
TOTAL RECOMMENDED Savings:
$29,694
Cost:
$38,509
$13,202 221,490 $16,492 981 $13,202
221,490
kWh
$16,492
981
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand