IAC Assessment: WV0686
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0686
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2025
Principal Product PCBA’s & Electro-Mechanical Assemblies
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 70,000
Annual Production 130,000 Pieces
Production Hrs. Annual 5,460
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,083 1,581,876 kWh $0.07
Electricity Demand $21,933 4,395 kW-months/year $4.99
Electricity Fees $3,617 - $ -
Natural Gas $12,218 1,772 MMBtu $6.90
TOTAL ENERGY COSTS $154,851
RECOMMENDED SAVINGS* $13,640 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,920
Cost:
$1,550
$4,286 57,907 $634 127 - - $4,286
57,907
kWh
$634
127
kW-months/year
-
-
MMBtu
02: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$2,427
Cost:
$11,850
$(-682) (-9,211) $(-100) (-20) $3,209 465 $(-682)
(-9,211)
kWh
$(-100)
(-20)
kW-months/year
$3,209
465
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,393
Cost:
$9,261
$181 2,455 $25 5 $2,187 317 $181
2,455
kWh
$25
5
kW-months/year
$2,187
317
MMBtu
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,875
Cost:
$1,135
$1,254 16,949 $110 22 $511 74 $1,254
16,949
kWh
$110
22
kW-months/year
$511
74
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$964
Cost:
$412
$849 10,624 $115 23 - - $849
10,624
kWh
$115
23
kW-months/year
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$814
Cost:
$894
$709 9,585 $105 21 - - $709
9,585
kWh
$105
21
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$247
Cost:
$108
$217 2,938 $30 6 - - $217
2,938
kWh
$30
6
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,640
Cost:
$25,210
$6,814 91,247 $919 184 $5,907 856 $6,814
91,247
kWh
$919
184
kW-months/year
$5,907
856
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas