Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
72
matching recommendationsNAICS | 115114 | Postharvest Crop Activities (except Cotton Ginning) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2217 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $108 | $0 | Implemented |
UW2217 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $997 | $1,779 | Implemented |
UW2217 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,995 | $28,937 | Implemented |
UW2217 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,705 | $9,295 | Implemented |
UW2216 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $1,223 | $836 | Implemented |
UW2216 # 03 Y:2022 | 03 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,366 | $760 | Implemented |
UW2216 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,121 | $14,855 | Implemented |
OR0733 # 02 Y:2020 | 02 | 2020 | USE OPTIMUM TEMPERATURE | $3,294 | $5,000 | Implemented |
OR0733 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $1,400 | $4,362 | Not Implemented |
OR0733 # 01 Y:2020 | 01 | 2020 | Install Anaerobic Digester | $30,707 | $224,950 | Not Implemented |
SF0480 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,524 | $22,649 | Not Implemented |
SF0480 # 09 Y:2016 | 09 | 2016 | USE SOLAR HEAT TO MAKE ELECTRICTY | $96,947 | $904,867 | Implemented |
SF0480 # 01 Y:2016 | 01 | 2016 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,228 | $0 | Implemented |
SF0480 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,097 | $219 | Implemented |
SF0480 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,403 | $354 | Implemented |
SF0480 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $6,041 | $31,062 | Implemented |
SF0480 # 05 Y:2016 | 05 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,005 | $4,163 | Not Implemented |
SF0480 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,322 | $10,120 | Not Implemented |
SF0480 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $187 | $0 | Implemented |
SF0440 # 09 Y:2013 | 09 | 2013 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,324 | $12,624 | Not Implemented |
SF0440 # 07 Y:2013 | 07 | 2013 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $17,219 | $50,025 | Not Implemented |
SF0440 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $11,533 | $66,403 | Implemented |
SF0440 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $212,131 | $19,224 | Implemented |
SF0440 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,854 | $11,795 | Implemented |
SF0440 # 06 Y:2013 | 06 | 2013 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $40,388 | $27,000 | Implemented |