IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 115114 Postharvest Crop Activities (except Cotton Ginning)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0440 # 07 Y:2013 07 2013 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $17,219 $50,025 Not Implemented
SF0440 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN WATER LINES AND VALVES $11,533 $66,403 Implemented
SF0440 # 09 Y:2013 09 2013 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,324 $12,624 Not Implemented
SF0376 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $397 $535 Implemented
SF0376 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,348 $20,943 Not Implemented
SF0376 # 05 Y:2009 05 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,149 $75,000 Implemented
SF0376 # 04 Y:2009 04 2009 AVOID FROST FORMATION ON EVAPORATORS $2,865 $9,600 Implemented
SF0376 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $2,011 $6,725 Implemented
SF0376 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,155 $110,307 Implemented
SF0339 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,202 $14,292 Implemented
SF0339 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,067 $10,458 Implemented
SF0339 # 05 Y:2007 05 2007 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $20,827 $26,019 Implemented
SF0339 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,752 $1,890 Implemented
SF0339 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $2,186 $1,188 Implemented
SF0339 # 02 Y:2007 02 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $9,340 $3,330 Not Implemented
SF0339 # 01 Y:2007 01 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $105,374 $0 Implemented
SF0338 # 15 Y:2007 15 2007 ELIMINATE/REDUCE AN OPERATION $187,500 $16,945 Implemented
SF0338 # 04 Y:2007 04 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $8,934 $2,310 Implemented
SF0338 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,563 $2,639 Implemented
SF0338 # 02 Y:2007 02 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $229,277 $80,000 Not Implemented
SF0338 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,653 $244 Not Implemented
SF0338 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $754 $2,432 Implemented
SF0338 # 12 Y:2007 12 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $2,832 $14,632 Not Implemented
SF0338 # 13 Y:2007 13 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $58,477 $704,893 Implemented
SF0338 # 14 Y:2007 14 2007 ELIMINATE/REDUCE AN OPERATION $123,261 $24,000 Implemented