Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,187
matching recommendationsNAICS | 221 | Utilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0565 # 02 Y:2024 | 02 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $41,677 | $125,540 | n/a |
LE0565 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,885 | $128,000 | n/a |
LE0565 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $308,745 | $1,680,000 | n/a |
SF0618 # 09 Y:2024 | 09 | 2024 | USE PHOTOCELL CONTROLS | $2,561 | $10,136 | n/a |
SF0618 # 03 Y:2024 | 03 | 2024 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $705,605 | $250,000 | n/a |
SF0618 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,266 | $3,170 | n/a |
SF0618 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,674 | $19,158 | n/a |
SF0618 # 06 Y:2024 | 06 | 2024 | REDESIGN PROCESS | $59,966 | $75,700 | n/a |
SF0618 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,359 | $2,340 | n/a |
SF0618 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $22,115 | $60,335 | n/a |
SF0618 # 10 Y:2024 | 10 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $875 | $3,607 | n/a |
SF0618 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,735 | $1,500 | n/a |
SF0618 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,570 | $175 | n/a |
AS0576 # 08 Y:2024 | 08 | 2024 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $138 | $90 | n/a |
AS0576 # 07 Y:2024 | 07 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $562 | $2,900 | n/a |
AS0576 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,891 | $18,800 | n/a |
AS0576 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,027 | $160 | n/a |
AS0576 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $188,394 | $1,306,404 | n/a |
AS0576 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $886 | $700 | n/a |
AS0576 # 03 Y:2024 | 03 | 2024 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,250 | $1,245 | n/a |
AS0576 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $872 | $1,035 | n/a |
WM0218 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,508 | $0 | n/a |
WM0218 # 01 Y:2024 | 01 | 2024 | USE SYNTHETIC LUBRICANT | $16,984 | $11,275 | n/a |
WM0218 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $11,685 | $1,659 | n/a |
WM0218 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,515 | $0 | n/a |