Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,150
matching recommendationsNAICS | 221 | Utilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0299 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,379 | $8,310 | n/a |
IC0299 # 05 Y:2024 | 05 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $263,888 | $200,000 | n/a |
IC0299 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $554 | $642 | n/a |
IC0299 # 09 Y:2024 | 09 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,790 | $31,894 | n/a |
IC0299 # 06 Y:2024 | 06 | 2024 | BURN A LESS EXPENSIVE GRADE OF FUEL | $447,899 | $23,503 | n/a |
IC0299 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $1,981 | $847 | n/a |
IC0299 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,372 | $2,712 | n/a |
IC0299 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $23,893 | $3,458 | n/a |
IC0299 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $89,084 | $34,144 | n/a |
UF0607 # 06 Y:2023 | 06 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $183,418 | $60,000 | n/a |
UF0607 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $173,293 | $118,890 | n/a |
UF0607 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $94,496 | $322,608 | n/a |
UF0607 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $122,669 | $11,700 | n/a |
UF0607 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $36,207 | $25,350 | n/a |
UF0607 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,683 | $0 | n/a |
UD1074 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $24,521 | $207,175 | n/a |
UD1074 # 02 Y:2024 | 02 | 2024 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,621 | $12,700 | n/a |
UD1074 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,018 | $8,430 | n/a |
UD1074 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $32,977 | $336,971 | n/a |
UD1074 # 01 Y:2024 | 01 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $9,834 | $0 | n/a |
UD1073 # 01 Y:2024 | 01 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $311 | $204 | n/a |
UD1073 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,782 | $120,000 | n/a |
UD1073 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,833 | $247,333 | n/a |
UF0606 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,322 | $322,608 | n/a |
UF0606 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,430 | $25,350 | n/a |