IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,275

matching recommendations
Reset
NAICS 221 Utilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0747 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,708 $7,587 Not Implemented
OR0747 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $57,063 $757,015 Not Implemented
UU0197 # 01 Y:2022 01 2022 USE POWER DURING OFF-PEAK PERIODS $13,098 $10,000 Implemented
UU0197 # 02 Y:2022 02 2022 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $12,033 $300 Implemented
UU0197 # 03 Y:2022 03 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,900 $3,000 Implemented
UU0197 # 04 Y:2022 04 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,230 $4,000 Implemented
UU0197 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $1,591 $6,000 Not Implemented
UU0197 # 06 Y:2022 06 2022 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $130 $25 Implemented
UU0197 # 07 Y:2022 07 2022 USE OPTIMUM TEMPERATURE $380 $200 Not Implemented
UF0573 # 01 Y:2022 01 2022 USE EXISTING DAM TO GENERATE ELECTRICITY $223,605 $552,197 Implemented
UF0573 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $50,619 $45,817 Implemented
UF0573 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $35,580 $50,843 Implemented
UF0573 # 04 Y:2022 04 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $324,658 $1,232,000 Implemented
UF0573 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $35,912 $10,000 Implemented
UF0573 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $4,292 $0 Implemented
IP0153 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,018 $53 Not Implemented
IP0153 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $73 $128 Not Implemented
IP0153 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,112 $6,705 Not Implemented
IP0153 # 04 Y:2021 04 2021 MAINTAIN MACHINES TO REDUCE LEAKS $36,991 $130,160 Not Implemented
UF0571 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $72,351 $83,616 Implemented
UF0571 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $23,651 $18,000 Implemented
UF0571 # 03 Y:2022 03 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $22,414 $51,208 Implemented
UF0571 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $4,673 $5,569 Implemented
UF0571 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $65,277 $10,000 Implemented
UF0571 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $8,754 $0 Implemented