Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,275
matching recommendationsNAICS | 221 | Utilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0158 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,446 | $33,852 | Not Implemented |
WM0158 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $3,864 | $2,250 | Not Implemented |
WM0158 # 06 Y:2020 | 06 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,778 | $965 | Not Implemented |
WM0158 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,132 | $0 | Implemented |
WM0158 # 08 Y:2020 | 08 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $783 | $1,513 | Not Implemented |
AS0486 # 01 Y:2020 | 01 | 2020 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,003,559 | $89,800 | Not Implemented |
AS0486 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $874,664 | $45,574 | Not Implemented |
AS0486 # 03 Y:2020 | 03 | 2020 | SELL COMBUSTIBLE WASTE | $125,510 | $39,685 | Not Implemented |
AS0486 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,726 | $16,955 | Implemented |
AS0486 # 05 Y:2020 | 05 | 2020 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $3,278 | $8,361 | Not Implemented |
AS0486 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $892 | $2,659 | Implemented |
AS0486 # 07 Y:2020 | 07 | 2020 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $568 | $693 | Implemented |
AS0486 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $381 | $132 | Implemented |
IP0134 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,050 | $660 | Not Implemented |
IP0134 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,106 | $2,237 | Implemented |
IP0134 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,816 | $28,862 | Not Implemented |
WM0156 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,527 | $105,000 | Not Implemented |
WM0156 # 02 Y:2020 | 02 | 2020 | USE SYNTHETIC LUBRICANT | $11,563 | $3,300 | Not Implemented |
WM0156 # 03 Y:2020 | 03 | 2020 | SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON | $9,593 | $0 | Not Implemented |
WM0156 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,847 | $13,133 | Not Implemented |
WM0156 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,864 | $3,527 | Implemented |
WM0156 # 06 Y:2020 | 06 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,164 | $0 | Implemented |
WM0156 # 07 Y:2020 | 07 | 2020 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,144 | $4,600 | Not Implemented |
WM0156 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,058 | $0 | Not Implemented |
WM0156 # 09 Y:2020 | 09 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $554 | $2,225 | Not Implemented |