IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 221 Utilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0586 # 01 Y:2019 01 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $110,861 $242,750 Not Implemented
WV0586 # 02 Y:2019 02 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $31,539 $1,630 Implemented
WV0586 # 03 Y:2019 03 2019 DEVELOP A REPAIR/REPLACE POLICY $3,336 $894 Implemented
WV0586 # 04 Y:2019 04 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $3,276 $11,875 Not Implemented
WV0586 # 05 Y:2019 05 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,701 $1,000 Implemented
WV0586 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,909 $2,793 Implemented
WV0586 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,900 $0 Not Implemented
NC0633 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,254 $27,000 Implemented
NC0633 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $920 $500 Not Implemented
NC0633 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,540 $10,000 Not Implemented
NC0633 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $1,338 $5,000 Not Implemented
NC0633 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,586 $6,135 Not Implemented
NC0588 # 01 Y:2017 01 2017 INSULATE BARE EQUIPMENT $24,750 $80,000 Not Implemented
NC0588 # 05 Y:2017 05 2017 DEVELOP A REPAIR/REPLACE POLICY $2,286 $5,865 Implemented
NC0588 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,766 $97,500 Implemented
NC0588 # 03 Y:2017 03 2017 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $26,851 $133,000 Not Implemented
NC0588 # 02 Y:2017 02 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,845 $38,000 Not Implemented
WV0536 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,902 $82,500 Not Implemented
WV0536 # 02 Y:2016 02 2016 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $8,800 $31,000 Not Implemented
WV0536 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,788 $1,000 Implemented
WV0536 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,983 $2,015 Implemented
WV0536 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,808 $2,250 Implemented
WV0536 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,406 $617 Implemented
WV0536 # 07 Y:2016 07 2016 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $735 $4,320 Implemented
WV0536 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $394 $60 Not Implemented