IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0432 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,101 $1,500 Not Implemented
LE0432 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,736 $14,000 Implemented
LE0432 # 05 Y:2017 05 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $55,121 $144,000 Implemented
LE0432 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $88,021 $265,000 Not Implemented
LE0432 # 08 Y:2017 08 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,019 $59,000 Implemented
LE0410 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,739 $7,770 Implemented
LE0410 # 07 Y:2016 07 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $218,663 $1,120,000 Implemented
LE0410 # 06 Y:2016 06 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,764 $8,200 Implemented
LE0410 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,755 $5,880 Implemented
LE0410 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,237 $5,320 Implemented
LE0410 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $77,576 $400 Implemented
LE0410 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $63,492 $80 Implemented
LE0405 # 05 Y:2015 05 2015 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $4,044 $20,000 Not Implemented
LE0405 # 04 Y:2015 04 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,477 $20,000 Not Implemented
LE0405 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,349 $6,500 Not Implemented
LE0405 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $9,299 $10,000 Not Implemented
LE0405 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $1,000 Implemented
DL0153 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,020 $1,000 Implemented
DL0153 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,580 $0 Not Implemented
DL0153 # 02 Y:2015 02 2015 REDUCE FLUID FLOW RATES $13,200 $10,000 Implemented
DL0153 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,260 $10,000 Implemented
DL0153 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $500 Implemented
DL0153 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $1,500 Implemented