Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0586 # 07 Y:2019 | 07 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,900 | $0 | Not Implemented |
WV0586 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,909 | $2,793 | Implemented |
WV0586 # 05 Y:2019 | 05 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,701 | $1,000 | Implemented |
WV0586 # 04 Y:2019 | 04 | 2019 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $3,276 | $11,875 | Not Implemented |
WV0586 # 03 Y:2019 | 03 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $3,336 | $894 | Implemented |
WV0586 # 02 Y:2019 | 02 | 2019 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $31,539 | $1,630 | Implemented |
WV0586 # 01 Y:2019 | 01 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $110,861 | $242,750 | Not Implemented |
NC0633 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,586 | $6,135 | Not Implemented |
NC0633 # 02 Y:2019 | 02 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $31,254 | $27,000 | Implemented |
NC0633 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $920 | $500 | Not Implemented |
NC0633 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,540 | $10,000 | Not Implemented |
NC0633 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $1,338 | $5,000 | Not Implemented |
NC0588 # 02 Y:2017 | 02 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,845 | $38,000 | Not Implemented |
NC0588 # 05 Y:2017 | 05 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $2,286 | $5,865 | Implemented |
NC0588 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,766 | $97,500 | Implemented |
NC0588 # 03 Y:2017 | 03 | 2017 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $26,851 | $133,000 | Not Implemented |
NC0588 # 01 Y:2017 | 01 | 2017 | INSULATE BARE EQUIPMENT | $24,750 | $80,000 | Not Implemented |
WV0536 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,983 | $2,015 | Implemented |
WV0536 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,808 | $2,250 | Implemented |
WV0536 # 06 Y:2016 | 06 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $1,406 | $617 | Implemented |
WV0536 # 07 Y:2016 | 07 | 2016 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $735 | $4,320 | Implemented |
WV0536 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $394 | $60 | Not Implemented |
WV0536 # 03 Y:2016 | 03 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,788 | $1,000 | Implemented |
WV0536 # 02 Y:2016 | 02 | 2016 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $8,800 | $31,000 | Not Implemented |
WV0536 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,902 | $82,500 | Not Implemented |