IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2413 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,582 $7,250 n/a
UW2413 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,186 $5,713 n/a
UW2413 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $53 $229 n/a
UW2413 # 03 Y:2024 03 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $20,435 $58,800 n/a
UW2413 # 02 Y:2024 02 2024 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $25,793 $13,368 n/a
UW2413 # 01 Y:2024 01 2024 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $8,896 $25,250 n/a
UW2411 # 03 Y:2024 03 2024 UPGRADE OBSOLETE EQUIPMENT $2,275 $0 n/a
UW2411 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $177 $715 n/a
UW2411 # 02 Y:2024 02 2024 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $5,536 $0 n/a
OR0737 # 01 Y:2021 01 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,782 $0 Not Implemented
OR0737 # 02 Y:2021 02 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,614 $0 Not Implemented
OR0737 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,884 $0 Implemented
OR0737 # 03 Y:2021 03 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,949 $0 Not Implemented
OR0737 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,820 $8,556 Implemented
OR0711 # 01 Y:2018 01 2018 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,082,323 $800,001 Not Implemented
OR0711 # 02 Y:2018 02 2018 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $68,286 $68,224 Not Implemented
OR0711 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,749 $10,303 Not Implemented
OR0711 # 05 Y:2018 05 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,097 $30,240 Not Implemented
OR0711 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,277 $1,904 Not Implemented
BS0050 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $143 $60 Implemented
BS0050 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $750 $660 Implemented
BS0050 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $89,269 $87,200 Implemented
OR0627 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $28,066 $0 Implemented
OR0627 # 09 Y:2014 09 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,631 $4,602 Not Implemented
OR0627 # 10 Y:2014 10 2014 USE PHOTOCELL CONTROLS $3,741 $7,191 Implemented