Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
85
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0099 # 05 Y:2012 | 05 | 2012 | USE OPTIMUM TEMPERATURE | $2,940 | $100 | Implemented |
DL0099 # 06 Y:2012 | 06 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $320,000 | $3,600,000 | Not Implemented |
DL0099 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,900 | $11,930 | Implemented |
DL0099 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,066 | $12,089 | Implemented |
DL0099 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,410 | $100 | Implemented |
DL0099 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,698 | $17,843 | Implemented |
OR0595 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,290 | $9,500 | Not Implemented |
OR0595 # 01 Y:2012 | 01 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $13,800 | $8,370 | Implemented |
OR0595 # 02 Y:2012 | 02 | 2012 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $39,919 | $200,000 | Not Implemented |
OR0595 # 03 Y:2012 | 03 | 2012 | RECOVER MECHANICAL ENERGY | $1,034 | $780 | Implemented |
OR0595 # 05 Y:2012 | 05 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,312 | $4,888 | Implemented |
MA0698 # 02 Y:2012 | 02 | 2012 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $8,226 | $6,500 | Not Implemented |
MA0698 # 07 Y:2012 | 07 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,076 | $9,870 | Not Implemented |
MA0698 # 06 Y:2012 | 06 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,103 | $5,900 | Not Implemented |
MA0698 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,082 | $4,410 | Not Implemented |
MA0698 # 04 Y:2012 | 04 | 2012 | REDESIGN PROCESS | $7,448 | $22,500 | Not Implemented |
MA0698 # 03 Y:2012 | 03 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,992 | $28,000 | Not Implemented |
MA0698 # 01 Y:2012 | 01 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,300 | $1,000 | Not Implemented |
SD0452 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,223 | $4,200 | Implemented |
SD0451 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,815 | $17,500 | Not Implemented |
SD0451 # 04 Y:2012 | 04 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,240 | $9,000 | Not Implemented |
SD0451 # 05 Y:2012 | 05 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $134,300 | $455,000 | Not Implemented |
SD0452 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $48,619 | $2,000 | Implemented |
SD0452 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $24,957 | $15,925 | Implemented |
SD0452 # 03 Y:2012 | 03 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $10,072 | $18,680 | Not Implemented |