Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
109
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0098 # 03 Y:2016 | 03 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,494 | $4,661 | Not Implemented |
WM0098 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,985 | $6,397 | Implemented |
WM0098 # 05 Y:2016 | 05 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,011 | $1,000 | Not Implemented |
WM0098 # 01 Y:2016 | 01 | 2016 | USE SYNTHETIC LUBRICANT | $31,522 | $56 | Implemented |
WM0098 # 06 Y:2016 | 06 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,334 | $0 | Not Implemented |
WM0098 # 07 Y:2016 | 07 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,178 | $0 | Not Implemented |
WM0098 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $888 | $1,140 | Not Implemented |
WM0098 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,481 | $0 | Implemented |
BS0092 # 01 Y:2016 | 01 | 2016 | USE EXISTING DAM TO GENERATE ELECTRICITY | $84,096 | $646,400 | Not Implemented |
BS0092 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,692 | $3,161 | Not Implemented |
BS0092 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,891 | $3,900 | Not Implemented |
BS0092 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $12,593 | $2,530 | Not Implemented |
BS0092 # 03 Y:2016 | 03 | 2016 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,842 | $464 | Not Implemented |
BS0092 # 04 Y:2016 | 04 | 2016 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $4,190 | $6,640 | Not Implemented |
MA0763 # 03 Y:2016 | 03 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,665 | $4,950 | Not Implemented |
MA0763 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,321 | $5,078 | Implemented |
MA0763 # 05 Y:2016 | 05 | 2016 | PAY UTILITY BILLS ON TIME | $2,873 | $500 | Implemented |
MA0763 # 06 Y:2016 | 06 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,753 | $1,000 | Implemented |
MA0763 # 07 Y:2016 | 07 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $940 | $3,880 | Not Implemented |
MA0763 # 02 Y:2016 | 02 | 2016 | USE EXISTING DAM TO GENERATE ELECTRICITY | $14,909 | $68,625 | Not Implemented |
MA0763 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,953 | $37,590 | Implemented |
WV0536 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $394 | $60 | Not Implemented |
WV0536 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,902 | $82,500 | Not Implemented |
WV0536 # 02 Y:2016 | 02 | 2016 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $8,800 | $31,000 | Not Implemented |
WV0536 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,983 | $2,015 | Implemented |