Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
188
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1714 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,475 | $5,000 | Implemented |
UK1714 # 04 Y:2017 | 04 | 2017 | REDUCE FLUID FLOW RATES | $5,426 | $0 | Implemented |
UK1714 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $2,092 | $1,444 | Implemented |
UK1714 # 05 Y:2017 | 05 | 2017 | REDESIGN PROCESS | $1,496 | $5,533 | Implemented |
UK1714 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,460 | $0 | Implemented |
LS0011 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,983 | $9,913 | Not Implemented |
LS0011 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $170 | $210 | Not Implemented |
LS0011 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $1,608 | $600 | Not Implemented |
LS0011 # 01 Y:2017 | 01 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $30,575 | $67,000 | Not Implemented |
LS0011 # 05 Y:2017 | 05 | 2017 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $291 | $0 | Implemented |
OR0695 # 03 Y:2017 | 03 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,279 | $43,386 | Implemented |
OR0695 # 02 Y:2017 | 02 | 2017 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $13,796 | $30,600 | Not Implemented |
OR0695 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,343 | $10,981 | Not Implemented |
WM0114 # 09 Y:2017 | 09 | 2017 | USE PHOTOCELL CONTROLS | $615 | $73 | Not Implemented |
WM0114 # 01 Y:2017 | 01 | 2017 | MAINTAIN MACHINES TO REDUCE LEAKS | $16,398 | $20,000 | Implemented |
WM0114 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,449 | $332 | Implemented |
WM0114 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $3,167 | $1,660 | Not Implemented |
WM0114 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,082 | $3,200 | Implemented |
WM0114 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,956 | $0 | Implemented |
WM0114 # 05 Y:2017 | 05 | 2017 | USE RADIANT HEATER FOR SPOT HEATING | $4,330 | $1,815 | Implemented |
WM0114 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,735 | $23,350 | Not Implemented |
WM0114 # 02 Y:2017 | 02 | 2017 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $13,132 | $72,000 | Not Implemented |
UK1708 # 04 Y:2017 | 04 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,895 | $0 | Not Implemented |
UK1708 # 03 Y:2017 | 03 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $2,904 | $0 | Not Implemented |
UK1708 # 09 Y:2017 | 09 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $22,096 | $78,750 | Not Implemented |