IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

273

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0143 # 08 Y:2020 08 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $118,506 $210,000 Not Implemented
IP0143 # 06 Y:2020 06 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $50,956 $54,000 Not Implemented
IP0143 # 04 Y:2020 04 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,298 $420 Implemented
IP0143 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,059 $1,227 Implemented
IP0143 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,338 $16,716 Implemented
IP0143 # 05 Y:2020 05 2020 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $474 $461 Not Implemented
IP0143 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,444 $143 Not Implemented
IP0143 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,901 $48 Implemented
IP0143 # 10 Y:2020 10 2020 INSULATE BARE EQUIPMENT $27,535 $79,808 Not Implemented
IP0143 # 01 Y:2020 01 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $233 $0 Implemented
BS0143 # 01 Y:2020 01 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,379 $1,225,000 Not Implemented
BS0143 # 03 Y:2020 03 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $68,374 $200,000 Not Implemented
BS0143 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $11 $25 Not Implemented
AM0815 # 03 Y:2020 03 2020 USE SYNTHETIC LUBRICANT $520 $200 Implemented
AM0815 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $210 $200 Not Implemented
AM0815 # 01 Y:2020 01 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,330 $4,570 Not Implemented
AM0815 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $2,600 $3,770 Not Implemented
DL0185 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $880 $1,036 Implemented
DL0185 # 04 Y:2020 04 2020 USE HEAT PUMP FOR SPACE CONDITIONING $12,790 $35,300 Not Implemented
DL0185 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,630 $10,000 Not Implemented
DL0185 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,920 $100,000 Implemented
DL0185 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,360 $10,000 Not Implemented
DL0185 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,910 $1,594 Implemented
AS0495 # 01 Y:2020 01 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $23,643 $3,941 Implemented
AS0495 # 05 Y:2020 05 2020 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $138 $33 Implemented