IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 22131 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0763 # 07 Y:2016 07 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $940 $3,880 Not Implemented
MA0763 # 06 Y:2016 06 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,753 $1,000 Implemented
MA0763 # 05 Y:2016 05 2016 PAY UTILITY BILLS ON TIME $2,873 $500 Implemented
MA0763 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,321 $5,078 Implemented
MA0763 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,665 $4,950 Not Implemented
MA0763 # 02 Y:2016 02 2016 USE EXISTING DAM TO GENERATE ELECTRICITY $14,909 $68,625 Not Implemented
MA0763 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,953 $37,590 Implemented
IA0561 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,633 $944 Implemented
IA0561 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,131 $19,250 Implemented
IA0561 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,312 $560 Implemented
IA0561 # 04 Y:2016 04 2016 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $533 $195 Implemented
IA0561 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $504 $70 Not Implemented
IA0561 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,225 $5,350 Implemented
MA0758 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $917 $960 Implemented
MA0758 # 01 Y:2016 01 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,549 $2,836 Implemented
MA0758 # 02 Y:2016 02 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,464 $500 Implemented
MA0758 # 06 Y:2016 06 2016 PAY UTILITY BILLS ON TIME $672 $500 Implemented
MA0758 # 05 Y:2016 05 2016 REDUCE VENTILATION AIR $754 $3,000 Not Implemented
MA0758 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,272 $1,450 Implemented
NC0567 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,225 $500 Implemented
NC0567 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,323 $500 Implemented
NC0567 # 03 Y:2016 03 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,630 $500 Implemented
NC0567 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,573 $24,432 Implemented
NC0567 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,671 $4,410 Implemented
NC0567 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $410 $868 Not Implemented