IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

617

matching recommendations
Reset
NAICS 221310 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0561 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,131 $19,250 Implemented
IA0561 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,633 $944 Implemented
IA0561 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,312 $560 Implemented
IA0561 # 04 Y:2016 04 2016 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $533 $195 Implemented
IA0561 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $504 $70 Not Implemented
IA0561 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,225 $5,350 Implemented
MA0758 # 01 Y:2016 01 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,549 $2,836 Implemented
MA0758 # 02 Y:2016 02 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,464 $500 Implemented
MA0758 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,272 $1,450 Implemented
MA0758 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $917 $960 Implemented
MA0758 # 05 Y:2016 05 2016 REDUCE VENTILATION AIR $754 $3,000 Not Implemented
MA0758 # 06 Y:2016 06 2016 PAY UTILITY BILLS ON TIME $672 $500 Implemented
NC0567 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,225 $500 Implemented
NC0567 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,323 $500 Implemented
NC0567 # 03 Y:2016 03 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,630 $500 Implemented
NC0567 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,573 $24,432 Implemented
NC0567 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,671 $4,410 Implemented
NC0567 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $410 $868 Not Implemented
NC0567 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $45 $160 Not Implemented
NC0567 # 08 Y:2016 08 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,741 $200,000 Not Implemented
WM0077 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $77,924 $0 Not Implemented
WM0077 # 02 Y:2015 02 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $70,576 $110,308 Not Implemented
WM0077 # 03 Y:2015 03 2015 USE SYNTHETIC LUBRICANT $25,966 $9,000 Not Implemented
WM0077 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,179 $0 Not Implemented
WM0077 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $152 $180 Not Implemented