Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,651
matching recommendationsNAICS | 22132 | Sewage Treatment Facilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2508 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $841 | $8,448 | n/a |
UW2508 # 01 Y:2025 | 01 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $272 | $6,858 | n/a |
UW2508 # 04 Y:2025 | 04 | 2025 | INSTALL DEDICATED MIXING EQUIP TO OPTIMIZE REUSE OF USED RINSEATE & TO PRECLUDE THE NEED FOR INTER-RUN CLEANING | $116,528 | $582,640 | n/a |
UW2508 # 02 Y:2025 | 02 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $665 | $8,888 | n/a |
UW2507 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $37,086 | $16,198 | n/a |
UW2507 # 01 Y:2025 | 01 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $170,715 | $5,537,300 | n/a |
UW2507 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $38,542 | $289,575 | n/a |
UW2507 # 06 Y:2025 | 06 | 2025 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $124,957 | $342,000 | n/a |
UW2507 # 04 Y:2025 | 04 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $399,297 | $329,940 | n/a |
UW2507 # 03 Y:2025 | 03 | 2025 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $5,795 | $10,336 | n/a |
SJ0036 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $13,688 | $62,974 | n/a |
SJ0036 # 06 Y:2025 | 06 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $39,541 | $0 | n/a |
SJ0036 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,847 | $12,868 | n/a |
SJ0036 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $7,434 | $51,497 | n/a |
SJ0036 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,243 | $0 | n/a |
SJ0036 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $74,641 | $376,992 | n/a |
TR0062 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $86,055 | $262,441 | n/a |
TR0062 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $333 | $357 | n/a |
TR0062 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $36,356 | $304,200 | n/a |
SJ0032 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $400 | $297 | n/a |
SJ0032 # 04 Y:2025 | 04 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $5,400 | $34,907 | n/a |
SJ0032 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,156 | $2,349 | n/a |
SJ0032 # 01 Y:2025 | 01 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $129,492 | $206,023 | n/a |
SJ0032 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $869 | $0 | n/a |
SJ0032 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $123 | $0 | n/a |