Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,625
matching recommendationsNAICS | 22132 | Sewage Treatment Facilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0032 # 04 Y:2025 | 04 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $5,400 | $34,907 | n/a |
SJ0032 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,156 | $2,349 | n/a |
SJ0032 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $400 | $297 | n/a |
SJ0032 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $869 | $0 | n/a |
SJ0032 # 01 Y:2025 | 01 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $129,492 | $206,023 | n/a |
SJ0032 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $123 | $0 | n/a |
IC0318 # 11 Y:2025 | 11 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,250 | $1,159 | n/a |
IC0318 # 06 Y:2025 | 06 | 2025 | REPLACE BOILER | $133,316 | $376,143 | n/a |
IC0318 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,255 | $8,951 | n/a |
IC0318 # 04 Y:2025 | 04 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $1,776,306 | $9,581,351 | n/a |
IC0318 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $74,545 | $10,174 | n/a |
IC0318 # 01 Y:2025 | 01 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $11,344 | $4,184 | n/a |
IC0318 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,649 | $4,909 | n/a |
IC0318 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $833 | $781 | n/a |
IC0318 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $2,756 | $391 | n/a |
IC0318 # 09 Y:2025 | 09 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $62,936 | $159,045 | n/a |
IC0318 # 12 Y:2025 | 12 | 2025 | Install Anaerobic Digester | $1,786,748 | $9,930,710 | n/a |
IC0318 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $688 | $63 | n/a |
OK1132 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $10,195 | $4,264 | n/a |
OK1132 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,986 | $421,200 | n/a |
OK1132 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,493 | $4,158 | n/a |
OK1132 # 03 Y:2024 | 03 | 2024 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $7,784 | $4,200 | n/a |
UW2413 # 01 Y:2024 | 01 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $8,896 | $25,250 | n/a |
UW2413 # 02 Y:2024 | 02 | 2024 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $25,793 | $13,368 | n/a |
UW2413 # 03 Y:2024 | 03 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $20,435 | $58,800 | n/a |