Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 22132 | Sewage Treatment Facilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0453 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,801 | $7,043 | Implemented |
SF0453 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,993 | $22,488 | Implemented |
SF0453 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $1,078 | $7,359 | Implemented |
SF0451 # 02 Y:2014 | 02 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,085 | $0 | Implemented |
SF0451 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,791 | $53,490 | Implemented |
SF0451 # 04 Y:2014 | 04 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $2,957 | $1,853 | Implemented |
SF0451 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $24,113 | $0 | Implemented |
SD0487 # 06 Y:2014 | 06 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,473 | $2,350 | Implemented |
SD0487 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,532 | $99,966 | Implemented |
SD0487 # 03 Y:2014 | 03 | 2014 | UPGRADE OBSOLETE EQUIPMENT | $9,337 | $35,560 | Implemented |
SD0487 # 04 Y:2014 | 04 | 2014 | REDUCE SCRAP PRODUCTION | $4,795 | $10,700 | Implemented |
SD0487 # 05 Y:2014 | 05 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,282 | $9,400 | Implemented |
SF0448 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,956 | $0 | Implemented |
SF0448 # 05 Y:2014 | 05 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,825 | $7,952 | Implemented |
MA0732 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,880 | $15,310 | Implemented |
MA0732 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,511 | $29,280 | Implemented |
MA0731 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,813 | $5,000 | Implemented |
DL0130 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $800 | $200 | Implemented |
DL0130 # 05 Y:2014 | 05 | 2014 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $3,400 | $8,400 | Implemented |
DL0130 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,400 | $800 | Implemented |
DL0130 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,689 | $88,625 | Implemented |
OR0627 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,856 | $39,597 | Implemented |
OR0627 # 10 Y:2014 | 10 | 2014 | USE PHOTOCELL CONTROLS | $3,741 | $7,191 | Implemented |
OR0627 # 07 Y:2014 | 07 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $10,323 | $17,350 | Implemented |
OR0627 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,799 | $1,000 | Implemented |