IAC Assessment: SD0487
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2014
Principal Product treated sewage water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 6
Plant Area (Sq.Ft.) 600,000
Annual Production 730,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,386 1,953,995 kWh $0.07
Electricity Demand $53,047 4,355 kW-months/year $12.18
Electricity Fees $3,626 - $ -
TOTAL ENERGY COSTS $189,059
RECOMMENDED SAVINGS* $88,765 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,419
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$55,346
Cost:
$151,250
$76,171 1,123,470 $16,443 1,350 $(-37,268) (-10,648) $76,171
1,123,470
kWh
$16,443
1,350
kW-months/year
$(-37,268)
(-10,648)
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,532
Cost:
$99,966
$1,536 - $11,996 1,150 - - $1,536
-
kWh
$11,996
1,150
kW-months/year
-
-
MMBtu
03: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$9,337
Cost:
$35,560
$9,337 137,709 - - - - $9,337
137,709
kWh
-
-
kW-months/year
-
-
MMBtu
04: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$4,795
Cost:
$10,700
$3,779 55,742 $1,016 83 - - $3,779
55,742
kWh
$1,016
83
kW-months/year
-
-
MMBtu
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$3,282
Cost:
$9,400
$2,895 42,702 $387 32 - - $2,895
42,702
kWh
$387
32
kW-months/year
-
-
MMBtu
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,473
Cost:
$2,350
$1,985 29,270 $488 40 - - $1,985
29,270
kWh
$488
40
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$88,765
Cost:
$309,226
$95,703 1,388,893 $30,330 2,656 $(-37,268) (-10,648) $95,703
1,388,893
kWh
$30,330
2,656
kW-months/year
$(-37,268)
(-10,648)
MMBtu
TOTAL IMPLEMENTED Savings:
$33,419
Cost:
$157,976
$19,532 265,423 $13,887 1,306 - - $19,532
265,423
kWh
$13,887
1,306
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas