IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,518

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0156 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $42,210 $37,500 Implemented
DL0156 # 03 Y:2015 03 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,350 $3,000 Not Implemented
DL0156 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,140 $3,000 Not Implemented
DL0156 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,590 $2,950 Implemented
DL0156 # 06 Y:2015 06 2015 RECOVER MECHANICAL ENERGY $7,880 $20,000 Not Implemented
DL0156 # 07 Y:2015 07 2015 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $19,680 $217,600 Not Implemented
LE0405 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $1,000 Implemented
LE0405 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $9,299 $10,000 Not Implemented
LE0405 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,349 $6,500 Not Implemented
LE0405 # 04 Y:2015 04 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,477 $20,000 Not Implemented
LE0405 # 05 Y:2015 05 2015 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $4,044 $20,000 Not Implemented
DL0153 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,580 $0 Not Implemented
DL0153 # 02 Y:2015 02 2015 REDUCE FLUID FLOW RATES $13,200 $10,000 Implemented
DL0153 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,020 $1,000 Implemented
DL0153 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $1,500 Implemented
DL0153 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $500 Implemented
DL0153 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,260 $10,000 Implemented
IP0043 # 01 Y:2015 01 2015 USE OPTIMUM TEMPERATURE $3,192 $0 Not Implemented
IP0043 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $439 $0 Not Implemented
IP0043 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $2,318 $1,216 Not Implemented
IP0043 # 04 Y:2015 04 2015 OPTIMIZE PLANT POWER FACTOR $5,219 $5,000 Not Implemented
IP0043 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,286 $16,000 Not Implemented
IP0043 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $168 $212 Not Implemented
IP0043 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,713 $6,999 Not Implemented
OR0648 # 01 Y:2015 01 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,127 $9,607 Implemented