Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,603
matching recommendationsNAICS | 221320 | Sewage Treatment Facilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1132 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,986 | $421,200 | n/a |
OK1132 # 03 Y:2024 | 03 | 2024 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $7,784 | $4,200 | n/a |
OK1132 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $10,195 | $4,264 | n/a |
OK1132 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,493 | $4,158 | n/a |
UW2413 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,186 | $5,713 | n/a |
UW2413 # 01 Y:2024 | 01 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $8,896 | $25,250 | n/a |
UW2413 # 02 Y:2024 | 02 | 2024 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $25,793 | $13,368 | n/a |
UW2413 # 03 Y:2024 | 03 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $20,435 | $58,800 | n/a |
UW2413 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,582 | $7,250 | n/a |
UW2413 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $53 | $229 | n/a |
DL0243 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,211 | $64,000 | n/a |
DL0243 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,139 | $51,000 | n/a |
DL0243 # 03 Y:2024 | 03 | 2024 | ELIMINATE/REDUCE AN OPERATION | $2,346 | $520 | n/a |
MUWT06 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $669 | $4,646 | n/a |
MUWT06 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,139 | $563 | n/a |
MUWT06 # 10 Y:2024 | 10 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $7,951 | $0 | n/a |
MUWT06 # 09 Y:2024 | 09 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,478 | $6,690 | n/a |
MUWT06 # 07 Y:2024 | 07 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,231 | $0 | n/a |
MUWT06 # 08 Y:2024 | 08 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,263 | $0 | n/a |
MUWT06 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,226 | $5,494 | n/a |
MUWT06 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,582 | $8,363 | n/a |
MUWT06 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $106 | $0 | n/a |
MUWT06 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20 | $20 | n/a |
OK1126 # 05 Y:2024 | 05 | 2024 | COMBINE UTILITY METERS | $906 | $3,300 | n/a |
OK1126 # 04 Y:2024 | 04 | 2024 | USE EXISTING DAM TO GENERATE ELECTRICITY | $11,753 | $42,900 | n/a |