Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,603
matching recommendationsNAICS | 221320 | Sewage Treatment Facilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0037 # 01 Y:2019 | 01 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $59,550 | $111,550 | Not Implemented |
NL0037 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,092 | $690 | Not Implemented |
NL0037 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,899 | $2,807 | Not Implemented |
NL0037 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130 | $46 | Not Implemented |
UF0533 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,828 | $109,400 | Implemented |
UF0533 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,877 | $213,770 | Implemented |
UF0533 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,145 | $54,910 | Implemented |
UF0533 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,617 | $472 | Implemented |
UF0533 # 05 Y:2019 | 05 | 2019 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $1,160 | $4,000 | Implemented |
UF0533 # 06 Y:2019 | 06 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $396,790 | $810,000 | Implemented |
CL1913 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,521 | $22,682 | Implemented |
CL1913 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,987 | $32,413 | Implemented |
CL1913 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,338 | $12,000 | Not Implemented |
CL1913 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $162,118 | $350,000 | Not Implemented |
CL1913 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $92,958 | $400,000 | Not Implemented |
SF0537 # 01 Y:2019 | 01 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,931 | $378 | Not Implemented |
SF0537 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,708 | $260 | Implemented |
SF0537 # 03 Y:2019 | 03 | 2019 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $94,349 | $10,000 | Not Implemented |
SF0537 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,414 | $648 | Implemented |
SF0537 # 05 Y:2019 | 05 | 2019 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $24,937 | $5,000 | Not Implemented |
SF0537 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,025 | $5,039 | Implemented |
SF0537 # 07 Y:2019 | 07 | 2019 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $2,238 | $3,000 | Implemented |
SF0537 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77,542 | $235,055 | Implemented |
SF0537 # 09 Y:2019 | 09 | 2019 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $41,345 | $175,000 | Not Implemented |
TR0013 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $1,099 | $216 | Implemented |