IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 221320 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0318 # 07 Y:2025 07 2025 INSTALL OCCUPANCY SENSORS $2,756 $391 n/a
IC0318 # 11 Y:2025 11 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $1,159 n/a
IC0318 # 09 Y:2025 09 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $62,936 $159,045 n/a
IC0318 # 12 Y:2025 12 2025 Install Anaerobic Digester $1,786,748 $9,930,710 n/a
IC0318 # 08 Y:2025 08 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $688 $63 n/a
IC0318 # 06 Y:2025 06 2025 REPLACE BOILER $133,316 $376,143 n/a
IC0318 # 05 Y:2025 05 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,255 $8,951 n/a
IC0318 # 04 Y:2025 04 2025 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $1,776,306 $9,581,351 n/a
IC0318 # 03 Y:2025 03 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $833 $781 n/a
IC0318 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,649 $4,909 n/a
IC0318 # 01 Y:2025 01 2025 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $11,344 $4,184 n/a
IC0318 # 10 Y:2025 10 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,545 $10,174 n/a
IC0243 # 01 Y:2020 01 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $1,582 $31,846 Not Implemented
IC0243 # 06 Y:2020 06 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $130,722 $713,750 Implemented
IC0243 # 05 Y:2020 05 2020 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $21,681 $40,000 Not Implemented
IC0243 # 04 Y:2020 04 2020 USE OPTIMUM TEMPERATURE $24,347 $0 Not Implemented
IC0243 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,698 $6,150 Implemented
IC0243 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $37,674 $140,751 Implemented
MZ0259 # 04 Y:2018 04 2018 RECOVER AND REUSE COOLING WATER $63,427 $203,000 Implemented
MZ0259 # 03 Y:2018 03 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $140,488 $304,000 Not Implemented
MZ0259 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $504 $780 Implemented
MZ0259 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,010 $29,034 Implemented
IC0209 # 03 Y:2018 03 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,608 $764 Not Implemented
IC0209 # 02 Y:2018 02 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,222 $11,728 Not Implemented
IC0209 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,273 $4,939 Implemented