IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 238 Specialty Trade Contractors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0845 # 09 Y:2013 09 2013 OPTIMIZE PLANT POWER FACTOR $2,148 $7,526 Not Implemented
OK0845 # 08 Y:2013 08 2013 USE RADIANT HEATER FOR SPOT HEATING $20,678 $90,000 Not Implemented
OK0845 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,780 $1,378 Not Implemented
OK0845 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,354 $12,299 Implemented
OK0845 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $90 $366 Not Implemented
OK0845 # 03 Y:2013 03 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,271 $3,608 Not Implemented
OK0845 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Not Implemented
OK0845 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,941 $550 Implemented
OK0845 # 06 Y:2013 06 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $318 $1,584 Implemented
UA3006 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $773 $170 Implemented
UA3006 # 04 Y:2010 04 2010 INSTALL TIMERS AND/OR THERMOSTATS $316 $50 Implemented
UA3006 # 02 Y:2010 02 2010 USE PHOTOCELL CONTROLS $197 $112 Not Implemented
UA3006 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,472 $5,000 Not Implemented
UA3006 # 07 Y:2010 07 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,594 $1,550 Not Implemented
UA3006 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,276 $800 Implemented
UA3006 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,330 $5,324 Implemented
UA0049 # 10 Y:2010 10 2010 COMBINE UTILITY METERS $25,470 $17,700 Implemented
UA0049 # 09 Y:2010 09 2010 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $2,800 $2,000 Implemented
UA0049 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,150 $384 Implemented
UA0049 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,990 $39,640 Implemented
UA0049 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,275 $2,520 Not Implemented
UA0049 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,870 $0 Not Implemented
UA0049 # 06 Y:2010 06 2010 USE PHOTOCELL CONTROLS $1,280 $670 Not Implemented
UA0049 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,170 $22,560 Implemented
UA0049 # 08 Y:2010 08 2010 USE OPTIMUM THICKNESS INSULATION $13,000 $13,430 Not Implemented