Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,132
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0127 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $120 | $1,026 | Implemented |
IC0127 # 05 Y:2007 | 05 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $36,459 | $0 | Implemented |
IC0127 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,336 | $20,976 | Implemented |
IC0127 # 07 Y:2007 | 07 | 2007 | INSULATE BARE EQUIPMENT | $3,818 | $886 | Implemented |
IC0127 # 08 Y:2007 | 08 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $2,137 | $1,000 | Implemented |
IC0127 # 09 Y:2007 | 09 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,282 | $0 | Implemented |
IC0127 # 10 Y:2007 | 10 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $22,675 | $50,711 | Implemented |
OK0746 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $32,026 | $30,757 | Implemented |
OK0746 # 04 Y:2007 | 04 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,580 | $4,541 | Implemented |
OK0746 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,287 | $3,000 | Implemented |
OK0746 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $3,256 | Implemented |
OK0746 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $0 | Implemented |
LE0253 # 01 Y:2007 | 01 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $41,910 | $32,000 | Implemented |
LE0253 # 03 Y:2007 | 03 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,542 | $300 | Implemented |
LE0253 # 04 Y:2007 | 04 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $20,904 | $300 | Implemented |
LE0253 # 05 Y:2007 | 05 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $20,819 | $37,000 | Implemented |
LE0253 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,186 | $1,000 | Implemented |
LE0253 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,349 | $6,200 | Implemented |
SF0342 # 03 Y:2007 | 03 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,746 | $7,500 | Implemented |
SF0342 # 07 Y:2007 | 07 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,176 | $22,780 | Implemented |
SF0342 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,677 | $54,912 | Implemented |
AM0529 # 02 Y:2007 | 02 | 2007 | OPTIMIZE PLANT POWER FACTOR | $41,500 | $86,400 | Implemented |
AM0529 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $3,110 | $2,165 | Implemented |
AM0529 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,160 | $360 | Implemented |
AM0529 # 08 Y:2007 | 08 | 2007 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $968 | $0 | Implemented |