IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0127 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $1,026 Implemented
IC0127 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,459 $0 Implemented
IC0127 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,336 $20,976 Implemented
IC0127 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $3,818 $886 Implemented
IC0127 # 08 Y:2007 08 2007 REPAIR AND ELIMINATE STEAM LEAKS $2,137 $1,000 Implemented
IC0127 # 09 Y:2007 09 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,282 $0 Implemented
IC0127 # 10 Y:2007 10 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $22,675 $50,711 Implemented
OK0746 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $32,026 $30,757 Implemented
OK0746 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,580 $4,541 Implemented
OK0746 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,287 $3,000 Implemented
OK0746 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $3,256 Implemented
OK0746 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $0 Implemented
LE0253 # 01 Y:2007 01 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $41,910 $32,000 Implemented
LE0253 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $22,542 $300 Implemented
LE0253 # 04 Y:2007 04 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,904 $300 Implemented
LE0253 # 05 Y:2007 05 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $20,819 $37,000 Implemented
LE0253 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,186 $1,000 Implemented
LE0253 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,349 $6,200 Implemented
SF0342 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,746 $7,500 Implemented
SF0342 # 07 Y:2007 07 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,176 $22,780 Implemented
SF0342 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,677 $54,912 Implemented
AM0529 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $41,500 $86,400 Implemented
AM0529 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,110 $2,165 Implemented
AM0529 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,160 $360 Implemented
AM0529 # 08 Y:2007 08 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $968 $0 Implemented