IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0236 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,322 $4,300 Implemented
LL0236 # 02 Y:2005 02 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,274 $9,000 Implemented
LL0236 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $3,312 $500 Implemented
LL0236 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $688 $300 Implemented
LL0236 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $295 $100 Implemented
MI0113 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,712 $52,535 Implemented
MI0113 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,230 $435 Implemented
MI0113 # 04 Y:2005 04 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $5,163 $17,100 Implemented
SF0311 # 01 Y:2005 01 2005 REPAIR AND ELIMINATE STEAM LEAKS $133,918 $0 Implemented
SF0311 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,048 $0 Implemented
SF0311 # 04 Y:2005 04 2005 REPAIR OR REPLACE STEAM TRAPS $24,768 $2,108 Implemented
SF0311 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,363 $6,375 Implemented
SF0311 # 17 Y:2005 17 2005 REUSE / RECYCLE/ SELL PAPER PRODUCTS $19,680 $12,330 Implemented
OK0713 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $81,171 $1,436 Implemented
OK0713 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,495 $85,051 Implemented
OK0713 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $5,346 $35 Implemented
OK0713 # 04 Y:2005 04 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $48,000 $35 Implemented
LL0231 # 02 Y:2005 02 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,617 $500 Implemented
LL0231 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,216 $750 Implemented
SF0308 # 01 Y:2005 01 2005 REPAIR AND ELIMINATE STEAM LEAKS $1,671 $0 Implemented
SF0308 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,813 $1,512 Implemented
SF0308 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,381 $9,206 Implemented
SF0308 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $455 $1,925 Implemented
GT0800 # 01 Y:2005 01 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $241,590 $283,800 Implemented
GT0800 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,617 $22,400 Implemented