Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,077
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2314 # 01 Y:2023 | 01 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,310 | $0 | Implemented |
SF0606 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,495 | $1,440 | Implemented |
SF0606 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,107 | $564 | Implemented |
SF0606 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $5,279 | $5,910 | Implemented |
SF0606 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,502 | $8,173 | Implemented |
SF0606 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $5,475 | $60 | Implemented |
MZ0347 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,683 | $0 | Implemented |
UU0224 # 02 Y:2023 | 02 | 2023 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,206 | $7,560 | Implemented |
MZ0347 # 06 Y:2023 | 06 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $1,668 | $380 | Implemented |
UU0224 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,460 | $1,382 | Implemented |
MZ0347 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $91,034 | $35,384 | Implemented |
UU0224 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,006 | $10,650 | Implemented |
UU0224 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,006 | $51 | Implemented |
UU0224 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,361 | $1,485 | Implemented |
WM0203 # 02 Y:2023 | 02 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $13,369 | $10,160 | Implemented |
WM0203 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,320 | $13,750 | Implemented |
WM0203 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,100 | $0 | Implemented |
WM0203 # 01 Y:2023 | 01 | 2023 | USE SYNTHETIC LUBRICANT | $16,641 | $45,000 | Implemented |
LE0551 # 03 Y:2023 | 03 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $111,339 | $525,000 | Implemented |
LE0551 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $69,768 | $5,000 | Implemented |
UU0223 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $16,735 | $51,600 | Implemented |
UU0223 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $277 | $142 | Implemented |
UU0223 # 04 Y:2023 | 04 | 2023 | INCREASE AMOUNT OF CONDENSATE RETURNED | $3,305 | $11,743 | Implemented |
UU0223 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,766 | $26,767 | Implemented |
UU0223 # 01 Y:2023 | 01 | 2023 | ELIMINATE SHIFT | $171,281 | $5,500 | Implemented |