IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0088 # 11 Y:2017 11 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,470 $8,388 Not Implemented
IP0088 # 12 Y:2017 12 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $394 $871 Not Implemented
IP0088 # 13 Y:2017 13 2017 INSULATE BARE EQUIPMENT $1,125 $2,464 Not Implemented
GT0905 # 03 Y:2017 03 2017 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $38 $107 Not Implemented
NC0598 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,448 $18,822 Implemented
NC0598 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $165 $547 Implemented
NC0598 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,199 $50 Not Implemented
NC0598 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,276 $1,050 Not Implemented
NC0598 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $932 $100 Implemented
NC0598 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $432 $500 Not Implemented
NC0598 # 07 Y:2017 07 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,584 $500 Not Implemented
GT0905 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $2,333 $700 Implemented
GT0905 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,361 $8,865 Implemented
NL0007 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $62,200 $77,400 Not Implemented
NL0007 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,300 $5,400 Implemented
NL0007 # 03 Y:2017 03 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $36,200 $1,700 Implemented
NL0007 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,300 $67,600 Implemented
NL0007 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,000 $3,100 Not Implemented
NL0007 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,250 $12,000 Implemented
NL0007 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $2,700 $840 Implemented
MI0318 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $60,626 $3,600 Implemented
MI0318 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,550 $39,636 Implemented
MI0318 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $21,088 $106,884 Not Implemented
MI0318 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,714 $1,660 Implemented
MI0318 # 05 Y:2017 05 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,034 $9,660 Implemented