IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,485

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0969 # 12 Y:2017 12 2017 INSTALL TURBULATORS $795 $1,250 Not Implemented
UD0969 # 13 Y:2017 13 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,423 $32,880 Not Implemented
UD0969 # 14 Y:2017 14 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,321 $811 Implemented
GT0903 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $295 $100 Implemented
GT0903 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $1,830 $975 Not Implemented
GT0903 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $308 $267 Implemented
GT0903 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,339 $3,360 Implemented
GT0903 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,199 $23,157 Implemented
GT0903 # 06 Y:2017 06 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $58,540 $613,275 Not Implemented
MI0314 # 01 Y:2017 01 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,333 $6,560 Implemented
MI0314 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,727 $1,660 Not Implemented
MI0314 # 03 Y:2017 03 2017 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,444 $3,600 Implemented
MI0314 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,595 $12,009 Implemented
MI0314 # 05 Y:2017 05 2017 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $4,033 $12,706 Not Implemented
MI0314 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,364 $1,125 Implemented
MI0314 # 07 Y:2017 07 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,023 $1,885 Not Implemented
MI0314 # 08 Y:2017 08 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,679 $290 Implemented
MI0314 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $518 $466 Not Implemented
MI0314 # 10 Y:2017 10 2017 USE PHOTOCELL CONTROLS $437 $240 Not Implemented
TR0002 # 01 Y:2017 01 2017 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $30,725 $22,000 Implemented
TR0002 # 02 Y:2017 02 2017 USE OPTIMUM THICKNESS INSULATION $6,968 $500 Implemented
TR0002 # 03 Y:2017 03 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $9,895 $10,000 Not Implemented
TR0002 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $55 Implemented
TR0002 # 05 Y:2017 05 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,329 $60 Implemented
TR0002 # 06 Y:2017 06 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,204 $0 Implemented