IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0586 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $200 Implemented
NC0586 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $988 $2,500 Implemented
NC0586 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,873 $9,000 Implemented
NC0586 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $929,030 $400,000 Implemented
NC0586 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,008 $2,890 Implemented
NC0586 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $2,834 $4,685 Implemented
UM0476 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,342 $9,000 n/a
UM0476 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,110 $16,000 n/a
UM0476 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,056 $2,500 n/a
UM0476 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,512 $8,125 n/a
UM0476 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $17,157 $50,000 n/a
DL0172 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,137 $8,000 Implemented
DL0172 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,948 $192 Not Implemented
DL0172 # 03 Y:2017 03 2017 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,765 $382 Not Implemented
DL0172 # 04 Y:2017 04 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,018 $0 Not Implemented
DL0172 # 05 Y:2017 05 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,205 $0 Not Implemented
DL0172 # 06 Y:2017 06 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,647 $428,406 Not Implemented
DL0172 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,657 $32,101 Not Implemented
DL0172 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,972 $48,444 Not Implemented
NC0583 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $61,111 $160,000 Not Implemented
NC0583 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,519 $6,412 Implemented
NC0583 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $200 Implemented
NC0583 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,222 $100 Not Implemented
NC0583 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $6,456 $7,000 Not Implemented
NC0583 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $2,529 $5,865 Implemented