Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0583 # 07 Y:2017 | 07 | 2017 | INSULATE FEEDWATER TANK | $665 | $1,106 | Implemented |
WM0099 # 01 Y:2016 | 01 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,017 | $11,200 | Not Implemented |
WM0099 # 02 Y:2016 | 02 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,528 | $0 | Not Implemented |
WM0099 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,427 | $12,056 | Not Implemented |
WM0099 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $2,414 | $4,360 | Not Implemented |
WM0099 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,368 | $2,600 | Not Implemented |
WM0099 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $902 | $2,200 | Not Implemented |
WM0099 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $861 | $900 | Not Implemented |
WM0099 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $733 | $2,000 | Not Implemented |
WM0099 # 09 Y:2016 | 09 | 2016 | INSULATE BARE EQUIPMENT | $685 | $481 | Not Implemented |
WM0099 # 10 Y:2016 | 10 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $358 | $120 | Implemented |
WM0099 # 11 Y:2016 | 11 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $344 | $0 | Implemented |
WM0099 # 12 Y:2016 | 12 | 2016 | INSULATE BARE EQUIPMENT | $274 | $315 | Implemented |
OK0951 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,548 | $62,561 | Not Implemented |
OK0951 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,244 | $12,740 | Not Implemented |
OK0951 # 03 Y:2016 | 03 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $26,114 | $42,500 | Not Implemented |
OK0951 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,904 | $3,000 | Implemented |
OK0951 # 05 Y:2016 | 05 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,675 | $2,816 | Implemented |
OK0951 # 06 Y:2016 | 06 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,980 | $7,000 | Not Implemented |
OK0951 # 07 Y:2016 | 07 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,684 | $1,972 | Not Implemented |
OK0951 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,014 | $4,000 | Not Implemented |
OK0951 # 09 Y:2016 | 09 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $159,843 | $40,000 | Not Implemented |
OK0951 # 10 Y:2016 | 10 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $13,152 | $0 | Not Implemented |
OK0951 # 11 Y:2016 | 11 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,880 | $0 | Not Implemented |
SF0495 # 01 Y:2016 | 01 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,207 | $661 | Implemented |