IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,819

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0958 # 08 Y:2016 08 2016 USE RADIANT HEATER FOR SPOT HEATING $2,283 $4,147 Not Implemented
OK0958 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,455 $0 Implemented
OK0958 # 10 Y:2016 10 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,151 $70,000 Implemented
OK0958 # 11 Y:2016 11 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,955 $100,000 Implemented
OK0958 # 12 Y:2016 12 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,996 $0 Implemented
OK0958 # 13 Y:2016 13 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $309,693 $1,927,657 Not Implemented
NC0586 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,081 $2,500 Implemented
NC0586 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $200 Implemented
NC0586 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $988 $2,500 Implemented
NC0586 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,873 $9,000 Implemented
NC0586 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $929,030 $400,000 Implemented
NC0586 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,008 $2,890 Implemented
NC0586 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $2,834 $4,685 Implemented
UM0476 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,342 $9,000 n/a
UM0476 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,110 $16,000 n/a
UM0476 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,056 $2,500 n/a
UM0476 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,512 $8,125 n/a
UM0476 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $17,157 $50,000 n/a
DL0172 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,137 $8,000 Implemented
DL0172 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,948 $192 Not Implemented
DL0172 # 03 Y:2017 03 2017 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,765 $382 Not Implemented
DL0172 # 04 Y:2017 04 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,018 $0 Not Implemented
DL0172 # 05 Y:2017 05 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,205 $0 Not Implemented
DL0172 # 06 Y:2017 06 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,647 $428,406 Not Implemented
DL0172 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,657 $32,101 Not Implemented