IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

353

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0233 # 05 Y:2006 05 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,990 $3,000 Not Implemented
LE0233 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,416 $2,500 Not Implemented
LE0233 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $881 $197 Not Implemented
LE0233 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $789 $1,000 Not Implemented
LE0233 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $465 $375 Not Implemented
LE0233 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,514 $12,000 Implemented
SU0209 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,769 $0 Implemented
SU0209 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,851 $0 Not Implemented
SU0209 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,742 $509 Implemented
SU0209 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,683 $418 Implemented
SU0209 # 05 Y:2005 05 2005 INSTALL TURBULATORS $1,988 $500 Not Implemented
SU0209 # 06 Y:2005 06 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $16,000 Implemented
SU0209 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $1,072 $1,000 Implemented
SU0209 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,558 $8,908 Not Implemented
WV0305 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $6,997 $96 Not Implemented
WV0305 # 02 Y:2004 02 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,442 $1,774 Implemented
WV0305 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,562 $221 Implemented
WV0305 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,370 $6,052 Implemented
WV0305 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,922 $1,000 Implemented
WV0305 # 06 Y:2004 06 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,458 $337 Implemented
WV0305 # 07 Y:2004 07 2004 REPAIR OR REPLACE STEAM TRAPS $2,040 $1,870 Implemented
WV0305 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,997 $472 Not Implemented
WV0305 # 09 Y:2004 09 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,769 $1,711 Not Implemented
WV0305 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $0 Not Implemented
WV0305 # 11 Y:2004 11 2004 INSULATE BARE EQUIPMENT $1,275 $591 Implemented