IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0549 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $329 $1,151 Implemented
BS0068 # 01 Y:2015 01 2015 USE OPTIMUM THICKNESS INSULATION $70 $51 Not Implemented
BS0068 # 02 Y:2015 02 2015 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,272 $5,853 Not Implemented
BS0068 # 03 Y:2015 03 2015 AIR CONDITION ONLY SPACE NECESSARY $1,060 $4,455 Not Implemented
BS0068 # 04 Y:2015 04 2015 USE OPTIMUM THICKNESS INSULATION $29 $100 Not Implemented
BS0068 # 05 Y:2015 05 2015 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $12,480 $11,240 Not Implemented
IP0053 # 01 Y:2015 01 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $57,305 $915 Implemented
IP0053 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,294 $160 Implemented
IP0053 # 03 Y:2015 03 2015 APPLY FOR INVESTMENT INCENTIVES $38,029 $5,000 Implemented
IP0053 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,650 $2,685 Implemented
IP0053 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $456 $924 Implemented
UD0938 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $39,463 $0 Not Implemented
UD0938 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,298 $0 Implemented
UD0938 # 03 Y:2015 03 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,403 $0 Not Implemented
UD0938 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $107,431 $0 Not Implemented
UD0938 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,938 $3,000 Not Implemented
UD0938 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
UD0938 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $152 $530 Implemented
UD0938 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,596 $20,100 Not Implemented
UD0938 # 09 Y:2015 09 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $807 $3,133 Not Implemented
UD0938 # 10 Y:2015 10 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,880 $15,000 Not Implemented
UD0938 # 11 Y:2015 11 2015 MINIMIZE WATER USAGE $27,153 $9,300 Not Implemented
MI0287 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $15,717 $1,400 Not Implemented
MI0287 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,892 $10,800 Implemented
MI0287 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,014 $4,218 Implemented